Hartlepool is home to Queens Meadow Business Park, Oakesway Business Park and Port of Hartlepool. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Hartlepool
Population 87,995 (Hartlepool built-up area, usual residents, Census 2021 (ONS, rounded to the nearest five))
Network operator Northern Powergrid (Northeast licence area)
Main employment areas Queens Meadow Business Park; Oakesway Business Park; Port of Hartlepool
Indicative yield About 945 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Hartlepool

  • Queens Meadow Business Park: The council's premier business park. When Hellens Group bought it from Homes England in 2022 it had 21 occupied industrial units, more than 100 businesses employing over 500 people and 65 hectares of land for future development.
  • Oakesway Business Park: One of the two business parks, with Queens Meadow, inside the Hartlepool Development Corporation's area, where the corporation has decided planning applications since 1 June 2023.
  • Port of Hartlepool: A port wholly owned and run by PD Ports with direct, lock-free access to the North Sea and extensive available land, handling dry bulk, steel and metals, forest products and project cargo, with pipe spooling and cable reel storage for energy work.

Large employers and sectors with sites here include:

  • Nuclear power (EDF Hartlepool power station): In July 2026 EDF extended Hartlepool power station's generating life to March 2030, two years beyond the planned 2028 date, keeping roughly 1,000 roles across Hartlepool and Heysham 1 for longer.
  • Film and TV production (Northern Studios): Investment Zone proposals approved by the Tees Valley Combined Authority cabinet in March 2025 include an indicative £15 million allocation to expand the Northern Studios in Hartlepool to support growth in the creative industries.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Hartlepool is served by Northern Powergrid (Northeast licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Hartlepool

Hartlepool follows the national planning rules for England, decided by Hartlepool council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Headland Conservation Area covers about 32.7 hectares of the old town and holds 35 listed buildings, two of them Grade I including the Church of St Hilda and the Town Wall and Sandwell Gate, so roofs there need more care.
  • At Queens Meadow, Oakesway and other land in its area, including the Middleton Grange Shopping Centre, planning applications go to the Hartlepool Development Corporation, the local planning authority there since 1 June 2023, which decides them using the borough council's Local Plan.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Hartlepool could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 945 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 94,500 kWh a year
Used on site 70% at 24p = £15,876 saved
Exported 30% at 5p = £1,418 earned
Total a year About £17,294
Simple payback About 5.2 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Hartlepool at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Hartlepool

At the end of 2025, Hartlepool had 3,020 solar PV installations with 75.5 MW of capacity, up 267% since 2020, according to government figures. The Hartlepool page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Hartlepool?

Northern Powergrid (Northeast licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Hartlepool?

About 94,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,294 a year. Your own roof, orientation and use will change this.

Can a business in Hartlepool get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for