Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Huntingdon

Huntingdon is home to Alconbury Weald Enterprise Campus and Ermine Business Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Huntingdonshire
Population 25,600 (Huntingdon built-up area, usual residents, Census 2021 (ONS))
Network operator UK Power Networks (Eastern Power Networks licence area)
Main employment areas Alconbury Weald Enterprise Campus; Ermine Business Park
Indicative yield About 1,034 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Huntingdon

  • Alconbury Weald Enterprise Campus: Urban&Civic's business campus at Alconbury Weald, Huntingdon. It says businesses there occupy over 1.5 million sq ft of employment space, with more than 3,000 employees based on site.
  • Ermine Business Park: Office and business park in Huntingdon, including Spitfire Close. In October 2025 BTG Eddisons sold Global House, a 3,552 sq ft three-storey office building on the park, to an investor planning specialist education use.

Large employers and sectors with sites here include:

  • Food production (Hilton Foods UK): Hilton Foods' Huntingdon site, expanded continually since 1994, produces on average 2.75 million packs a week of beef, lamb, ready to cook, slow cooked, vegan and vegetarian products, and supplies 41% of UK households each year.
  • Chocolate manufacturing (Hotel Chocolat): Hotel Chocolat, owned by Mars since January 2024, was making more than 200 million chocolates a year from 400 recipes at its Hadley Park production headquarters in Huntingdon in December 2025.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Huntingdon is served by UK Power Networks (Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Huntingdon

Huntingdon follows the national planning rules for England, decided by Huntingdonshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Huntingdon Conservation Area, designated in 1972, is large at about 203 hectares and holds 119 listed buildings, including the Grade I Hinchingbrooke House, Huntingdon Bridge and the churches of All Saints and St Mary, so roofs across much of the town centre need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Huntingdon could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,034 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 103,400 kWh a year
Used on site 70% at 24p = £17,371 saved
Exported 30% at 5p = £1,551 earned
Total a year About £18,922
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Huntingdon at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Huntingdonshire

At the end of 2025, Huntingdonshire had 7,031 solar PV installations with 162.1 MW of capacity, up 77% since 2020, according to government figures. The Huntingdonshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Huntingdon?

UK Power Networks (Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Huntingdon?

About 103,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,922 a year. Your own roof, orientation and use will change this.

Can a business in Huntingdon get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for