Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Leek

Leek is home to Barnfield Industrial Estate, Leekbrook Industrial Estate and Land east of Brooklands Way, Leekbrook. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Staffordshire Moorlands
Population 19,385 (Leek built-up area, usual residents, Census 2021 (ONS))
Network operator National Grid Electricity Distribution (West Midlands licence area)
Main employment areas Barnfield Industrial Estate; Leekbrook Industrial Estate; Land east of Brooklands Way, Leekbrook
Indicative yield About 897 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Leek

  • Barnfield Industrial Estate: Staffordshire Moorlands District Council's spring 2026 investment prospectus names it as a principal industrial area in Leek, with a mix of light industrial and commercial businesses serving local demand. Ornua's cheese packing site on Sunnyhills Road is in this part of town.
  • Leekbrook Industrial Estate: Named in the council's 2026 prospectus as one of the main industrial estates supporting manufacturing, storage and local service businesses. In March 2022 council officers approved two new warehouses on Basford Lane Industrial Estate at Leekbrook to store pallets for businesses on the estate.
  • Land east of Brooklands Way, Leekbrook: Promoted in the 2026 prospectus as an employment and mixed use development opportunity next to existing industrial and commercial areas, with good access to the A520 and an allocation for employment focused development.

Large employers and sectors with sites here include:

  • Cheese packing (Ornua Foods UK): Ornua runs a cheese packing facility on Sunnyhills Road, Leek, and describes Ornua Foods UK as the UK's largest supplier of pre-packed hard cheese, supplying every major UK food retailer under brands including Pilgrims Choice and Kerrygold.
  • Speciality chemicals (Croda): Croda bought C M Keyworth of Leek in 1954 and says the Leek site is today its flagship Omega 3 manufacturing site; it opened a lipids plant there in 1996 to meet demand for high purity Omega 3 fish oil.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Leek is served by National Grid Electricity Distribution (West Midlands licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Leek

Leek follows the national planning rules for England, decided by Staffordshire Moorlands council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Leek parish has 144 buildings on the National Heritage List for England (one Grade I and five Grade II*), mostly town houses, shops, pubs and mills, so many older town centre and mill roofs need listed building or conservation area care before panels go on.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Leek could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 897 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 89,700 kWh a year
Used on site 70% at 24p = £15,070 saved
Exported 30% at 5p = £1,346 earned
Total a year About £16,415
Simple payback About 5.5 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Leek at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Staffordshire Moorlands

At the end of 2025, Staffordshire Moorlands had 2,815 solar PV installations with 36.3 MW of capacity, up 22% since 2020, according to government figures. The Staffordshire Moorlands page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Leek?

National Grid Electricity Distribution (West Midlands licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Leek?

About 89,700 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £16,415 a year. Your own roof, orientation and use will change this.

Can a business in Leek get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for