Key facts
| Council area | Maidstone |
| Population | 109,490 (Maidstone built-up area, usual residents, Census 2021 (ONS)) |
| Network operator | UK Power Networks (South Eastern Power Networks licence area) |
| Main employment areas | Kent Medical Campus; Parkwood Trading Estate |
| Indicative yield | About 1,048 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Maidstone
- Kent Medical Campus: Campus at Gidds Pond Way, Weavering, on the edge of Maidstone, home to the Maidstone Innovation Centre, a council-backed hub for MedTech, life science and healthcare businesses.
- Parkwood Trading Estate: Established in about the mid 1950s off and along Bircholt Road in Park Wood, with a varied mix of large and small businesses.
Large employers and sectors with sites here include:
- TV and film production (Maidstone Studios): Maidstone Studios on New Cut Road describes itself as one of the UK's largest independent regional TV and film facilities, facilitating production for over 40 years, with all its energy from 100% renewable sources and heat recovered from its data centre.
- MedTech and life sciences: The Maidstone Innovation Centre on Kent Medical Campus is a hub for MedTech, life science and healthcare, aiming to increase the output of high-tech health innovations, with workspaces and meeting spaces for businesses.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Maidstone is served by UK Power Networks (South Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Maidstone
Maidstone follows the national planning rules for England, decided by Maidstone council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- The Maidstone Town Centre conservation area was designated on 18 July 1974 and covers the historic centre, so check whether a building is inside it before planning roof panels.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Maidstone could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,048 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 104,800 kWh a year |
| Used on site | 70% at 24p = £17,606 saved |
| Exported | 30% at 5p = £1,572 earned |
| Total a year | About £19,178 |
| Simple payback | About 4.7 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Maidstone at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Maidstone
At the end of 2025, Maidstone had 5,715 solar PV installations with 36.8 MW of capacity, up 64% since 2020, according to government figures. The Maidstone page has the full local figures and how they compare.
Nearby towns
- Sittingbourne, about 10 miles away
- Tonbridge, about 12 miles away
- Ashford, about 17 miles away
- Bexhill-on-Sea, about 30 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- maidstoneinnovationcentre.co.uk
- en.wikipedia.org: Park Wood, Maidstone
- maidstonestudios.com
- maidstonestudios.com: sustainability
- gov.uk: enterprise zones
- gov.uk: maps of uk freeports
- assets.publishing.service.gov.uk: Investment Zones Pack Dec 2025
- planning.data.gov.uk
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Maidstone?
UK Power Networks (South Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Maidstone?
About 104,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £19,178 a year. Your own roof, orientation and use will change this.
Can a business in Maidstone get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Maidstone5,715 installations, 36.8 MW of solar and about 1,069 kWh per kWp a year for a south-facing roof.
- South EastTwo network operators, strong south coast yields, Kent horticulture, Thames Valley offices and Solent logistics, and the clean air zones that affect fleets.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.