Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Mold

Mold is home to Mold Business Park, Mold Industrial Estate and Broncoed Industrial Estate. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Flintshire
Population 9,890 (Mold built-up area, usual residents, Census 2021 (ONS))
Network operator SP Energy Networks (SP Manweb, Merseyside and North Wales licence area)
Main employment areas Mold Business Park; Mold Industrial Estate; Broncoed Industrial Estate
Indicative yield About 961 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Mold

  • Mold Business Park: A compact office and industrial park off the A494, a Principal Employment Area in Flintshire's Local Development Plan, which also allocates a further 3.90 hectares there for business, industry and storage.
  • Mold Industrial Estate: A fully developed, established business park and industrial estate split into two sections along Queen's Lane and bounded by housing and the A494, meeting local needs for offices and mid-sized industrial premises.
  • Broncoed Industrial Estate: A small, modern local employment area with workshop premises for local firms and office units to the rear, protected as a Principal Employment Area.

Large employers and sectors with sites here include:

  • Arts and culture (Theatr Clwyd): Theatr Clwyd's £50 million redevelopment, due to reopen in June 2025, was expected to create 100 jobs and up to £30 million a year for the local economy, with solar power, air source heating and rainwater harvesting making it a fossil-free building.
  • Local government (Flintshire County Council): Shire Hall in Mold, next to Theatr Clwyd in the civic complex, is home to Flintshire County Council.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Mold is served by SP Energy Networks (SP Manweb, Merseyside and North Wales licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Mold

Planning in Mold is decided by Flintshire council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • Mold's town centre is one of Flintshire's 32 conservation areas, one of only three covering the centres of historic market towns, so check whether a building is inside it before planning roof panels.
  • In Wales, panels on a non-domestic building are usually permitted development if they project no more than 200mm from the roof or wall (1 metre above a flat roof) and sit at least 1 metre from the roof edge, but in a conservation area panels on a principal or side elevation wall need planning consent, and a listed building needs planning permission and listed building consent.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Mold could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 961 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 96,100 kWh a year
Used on site 70% at 24p = £16,145 saved
Exported 30% at 5p = £1,442 earned
Total a year About £17,586
Simple payback About 5.1 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Discounted fixed rate green loans, as part of a funding package with consultancy support, for energy efficiency measures and low carbon projects, with renewables including solar PV listed as typical eligible projects; repayments can start with a capital repayment holiday and the term is tied to the project's payback period. Limited companies, sole traders and partnerships must be based in Wales, have traded for at least two years and have at least one set of filed annual accounts. A grant of up to 50% of the cost of a detailed energy audit, to a maximum of £10,000 (£20,000 total costs), is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Flintshire

At the end of 2025, Flintshire had 7,590 solar PV installations with 112.3 MW of capacity, up 22% since 2020, according to government figures. The Flintshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Mold?

SP Energy Networks (SP Manweb, Merseyside and North Wales licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Mold?

About 96,100 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,586 a year. Your own roof, orientation and use will change this.

Can a business in Mold get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for