Newport is home to Imperial Park and Celtic Springs Business Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Newport
Population 130,890 (Newport (Newport) built-up area, usual residents, Census 2021 (ONS, rounded to the nearest five))
Network operator National Grid Electricity Distribution (South Wales licence area)
Main employment areas Imperial Park; Celtic Springs Business Park
Indicative yield About 1,025 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Newport

  • Imperial Park: Part of Newport's compound semiconductor cluster, where the former LG Semiconductors site was sold by the Welsh Government to the City Deal councils. KLA has a 237,000 sq ft manufacturing and research and development facility there, backed by £6.25m from the Cardiff Capital Region in 2025.
  • Celtic Springs Business Park: An office park at Coedkernew, Newport, home to Wales & West House, the registered office of gas distributor Wales & West Utilities.

Large employers and sectors with sites here include:

  • Compound semiconductors: The UK Government describes Newport as a semiconductor hub where businesses including KLA, IQE and Vishay are located, and made it a focus of the Cardiff Capital Region Investment Zone in June 2025.
  • Public sector (Intellectual Property Office): The Intellectual Property Office has offices in Newport and London and a team of approximately 1,600 people.
  • Gas distribution (Wales & West Utilities): Wales & West Utilities, registered at Celtic Springs, has more than 1,300 colleagues serving 7.5 million customers across Wales and the south west of England.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Newport is served by National Grid Electricity Distribution (South Wales licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Newport

Planning in Newport is decided by Newport council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • Newport's Town Centre Conservation Area, about 9.6 hectares and designated in March 1987, covers 60 postcodes, with the St Woolos, Clytha and Lower Dock Street conservation areas close by, so check a building's status before planning roof panels in the centre.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Newport could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,025 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 102,500 kWh a year
Used on site 70% at 24p = £17,220 saved
Exported 30% at 5p = £1,538 earned
Total a year About £18,758
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Discounted fixed interest rate green business loans for energy efficiency measures and low carbon projects, with renewables including solar PV listed as typical eligible projects; capital repayment holidays are available and the loan term is linked to the project's payback. Limited companies, sole traders and partnerships must be based in Wales, have traded for at least two years and have at least one set of filed annual accounts. A Business Wales grant of up to 50% of the cost of a detailed energy audit, to a maximum of £10,000 (£20,000 total costs), is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Newport

At the end of 2025, Newport had 4,233 solar PV installations with 111.9 MW of capacity, up 322% since 2020, according to government figures. The Newport page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Newport?

National Grid Electricity Distribution (South Wales licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Newport?

About 102,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,758 a year. Your own roof, orientation and use will change this.

Can a business in Newport get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for