Key facts
| Council area | Oldham |
| Population | 110,720 (Oldham built-up area, usual residents, Census 2021 (ONS)) |
| Network operator | Electricity North West (North West licence area) |
| Main employment areas | Hollinwood Junction; Higginshaw and Hathershaw employment areas |
| Indicative yield | About 855 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Oldham
- Hollinwood Junction: A Langtree and Oldham Council regeneration site beside junction 22 of the M60 at Hollinwood, on a former gas holder site. In June 2025 Indurent forward funded 13 industrial units totalling 192,000 sq ft of distribution and manufacturing space, due to finish in the third quarter of 2026.
- Higginshaw and Hathershaw employment areas: Long established employment areas that Oldham Council's 2021 economy paper scored as top locations for manufacturing and construction, providing affordable, flexible premises with high occupancy.
Large employers and sectors with sites here include:
- Health and social care: Oldham Council's 2021 economy and employment paper said health and social care was Oldham's largest sector, with 14.2% of jobs.
- Manufacturing: The same 2021 council paper put manufacturing as Oldham's third largest sector, with 11.5% of jobs, and named Higginshaw as the top scoring site for it.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Oldham is served by Electricity North West (North West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Oldham
Oldham follows the national planning rules for England, decided by Oldham council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- Oldham Council adopted the Oldham Town Centre Conservation Area Appraisal and Management Plan on 19 August 2019, and four extensions to the conservation area boundary have been designated, so check whether a town centre building is inside it before planning panels.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Oldham could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 855 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 85,500 kWh a year |
| Used on site | 70% at 24p = £14,364 saved |
| Exported | 30% at 5p = £1,283 earned |
| Total a year | About £15,646 |
| Simple payback | About 5.8 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Oldham at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Oldham
At the end of 2025, Oldham had 3,636 solar PV installations with 17.5 MW of capacity, up 74% since 2020, according to government figures. The Oldham page has the full local figures and how they compare.
Nearby towns
- Rochdale, about 6 miles away
- Bury, about 8 miles away
- Stockport, about 9 miles away
- Bolton, about 13 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- placenorthwest.co.uk: indurent opens door for oldham sheds with 25m
- oldham.gov.uk: economy and employment topic paper
- gov.uk: investment zones in england
- gov.uk: enterprise zones
- oldham.gov.uk: local plan supplementary planning documents
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Oldham?
Electricity North West (North West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Oldham?
About 85,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,646 a year. Your own roof, orientation and use will change this.
Can a business in Oldham get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Oldham3,636 installations, 17.5 MW of solar and about 842 kWh per kWp a year for a south-facing roof.
- North WestTwo network operators, realistic northern yields, Trafford Park, the Port of Liverpool, Cheshire chemicals and Cumbrian farming, and Greater Manchester's non-charging clean air plan.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.