Key facts
| Council area | North Hertfordshire |
| Population | 17,445 (Royston (North Hertfordshire) built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5)) |
| Network operator | UK Power Networks (Eastern Power Networks licence area) |
| Main employment areas | Orchard Road employment area; Land north of York Way |
| Indicative yield | About 1,031 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Royston
- Orchard Road employment area: A 38.9 hectare designated employment area to the north of the town in the North Hertfordshire Local Plan 2011 to 2031 (adopted November 2022), which says it is thriving off both the Hertfordshire and Cambridge economies, with many Johnson Matthey operations.
- Land north of York Way: A 10.9 hectare employment allocation (Policy RY9) extending the York Way employment area, which must deliver a new access to the Orchard Road employment area from the A505.
Large employers and sectors with sites here include:
- Precious metals and catalysts (Johnson Matthey): In July 2025 the Environment Agency varied the permit for Johnson Matthey's Royston site to add the Third Century Refinery, a precious metals refinery replacing its platinum group metals refinery, and iridium based manufacture of catalyst coated membranes for hydrogen fuel cells.
- Product inspection equipment (Mettler-Toledo): In 2021 Mettler-Toledo's Product Inspection business opened a new x-ray manufacturing facility on a 1.4 hectare site in Royston as its global centre of excellence for x-ray, expanding its UK manufacturing footprint by more than 80%.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Royston is served by UK Power Networks (Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Royston
Royston follows the national planning rules for England, decided by North Hertfordshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- The Royston Conservation Area, designated on 10 June 1969, covers about 24.2 hectares with 111 listed buildings, four of them Grade I including Royston Cave, so check a building's status before planning roof panels in the centre.
- The local plan says land north of York Way lies within a Health and Safety Executive consultation zone and needs sensitive design for views to and from the scheduled monuments on Therfield Heath, which can shape new employment buildings there.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Royston could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,031 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 103,100 kWh a year |
| Used on site | 70% at 24p = £17,321 saved |
| Exported | 30% at 5p = £1,547 earned |
| Total a year | About £18,867 |
| Simple payback | About 4.8 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Choosing a commercial solar installer in Royston
Whichever commercial solar panel company, contractor or installer you talk to in Royston, the checks that matter are the same:
- Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with UK Power Networks.
- Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
- A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
- Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.
Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Royston sites with.
Funding and support
We found no council or regional grant for business solar open in Royston at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across North Hertfordshire
At the end of 2025, North Hertfordshire had 4,214 solar PV installations with 43.2 MW of capacity, up 36% since 2020, according to government figures. The North Hertfordshire page has the full local figures and how they compare.
Nearby towns
- Letchworth Garden City, about 10 miles away
- Stevenage, about 12 miles away
- Bishop's Stortford, about 14 miles away
- St Neots, about 16 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- democracy.north-herts.gov.uk: Public reports pack 02nd Nov 2022 19.30 Cabinet
- democracy.north-herts.gov.uk: 190129 Article 4 direction Appendix A
- assets.publishing.service.gov.uk: EPR BT7086IJ V017 Decision document
- english.fleischwirtschaft.de: event new headquarter and products presented 51370
- gov.uk: enterprise zones
- heritagecheck.co.uk: royston
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Royston?
UK Power Networks (Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Royston?
About 103,100 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,867 a year. Your own roof, orientation and use will change this.
How do I choose a commercial solar installer in Royston?
Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with UK Power Networks), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.
Can a business in Royston get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- North Hertfordshire4,214 installations, 43.2 MW of solar and about 1,014 kWh per kWp a year for a south-facing roof.
- East of EnglandUK Power Networks connections, strong yields, the Felixstowe and A14 logistics corridor, arable farming and food processing across Norfolk, Suffolk and the Fens.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.