Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Skipton

Skipton is home to Snaygill Industrial Estate, Land east of the A629, south of Sandylands and Skipton Auction Mart, Gargrave Road. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area North Yorkshire
Population 15,050 (Skipton built-up area, usual residents, Census 2021 (ONS))
Network operator Northern Powergrid (Yorkshire licence area)
Main employment areas Snaygill Industrial Estate; Land east of the A629, south of Sandylands; Skipton Auction Mart, Gargrave Road
Indicative yield About 901 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Skipton

  • Snaygill Industrial Estate: An established industrial estate off Keighley Road. The council's 2022 schedule of employment sites lists land at J N Bentley Ltd on the estate, west of Keighley Road, as an existing employment area where business, industrial and storage uses are acceptable.
  • Land east of the A629, south of Sandylands: A 23.5 hectare site west of Carleton Road, partly an existing employment area and partly allocated for business, industrial and storage uses in the Craven Local Plan.
  • Skipton Auction Mart, Gargrave Road: Craven Cattle Marts' site on the outskirts of the town, built in 1989 and redeveloped between 2002 and 2007, where the livestock market sits at the heart of a business park with land agents, vets, machinery dealers and farm suppliers. Land between the mart and the canal is allocated for employment use.

Large employers and sectors with sites here include:

  • Financial services (Skipton Building Society): Skipton Building Society, founded in 1853, has its head office at The Bailey in Skipton, where its Skipton Business Finance arm, providing invoice finance to small and medium firms, is also based.
  • Livestock trading (Craven Cattle Marts): Craven Cattle Marts says its Skipton market sells 275,000 sheep and 20,000 cattle a year and has been one of the leading centres for working sheepdog sales since 1996.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Skipton is served by Northern Powergrid (Yorkshire licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Skipton

Skipton follows the national planning rules for England, decided by North Yorkshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Skipton has conservation areas covered by the council's 2008 appraisal, with boundaries changed since. The council says conservation areas have different planning rules, with permission needed for some small proposals that would otherwise be permitted development, so roofs in and near the historic centre need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Skipton could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 901 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 90,100 kWh a year
Used on site 70% at 24p = £15,137 saved
Exported 30% at 5p = £1,352 earned
Total a year About £16,488
Simple payback About 5.5 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Skipton at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across North Yorkshire

At the end of 2025, North Yorkshire had 25,856 solar PV installations with 339.9 MW of capacity, up 110% since 2020, according to government figures. The North Yorkshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Skipton?

Northern Powergrid (Yorkshire licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Skipton?

About 90,100 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £16,488 a year. Your own roof, orientation and use will change this.

Can a business in Skipton get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for