Skip to content
CommercialSolarSurveys.com

Commercial solar installers in St Austell

St Austell is home to Holmbush Industrial Estate and Carluddon Technology Park (ESAM). This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Cornwall
Population 24,360 (St Austell built-up area, usual residents, Census 2021 (ONS))
Network operator National Grid Electricity Distribution (South West licence area)
Main employment areas Holmbush Industrial Estate; Carluddon Technology Park (ESAM)
Indicative yield About 1,054 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in St Austell

  • Holmbush Industrial Estate: St Austell's largest employment site, on the A391. Cornwall Council's Site Allocations plan protects it (STA-E1) as a strategically important employment site.
  • Carluddon Technology Park (ESAM): A council owned site at the heart of the West Carclaze Garden Village near St Austell, managed by Cornwall Development Company. Its Enterprise Space for Advanced Manufacturing has 32 flexible units (offices, workshops and industrial units) for advanced manufacturing, engineering and low carbon firms; the first phase was completed in 2018.

Large employers and sectors with sites here include:

  • China clay (Imerys): In May 2025 Imerys announced nearly £18 million for a new dry mining plant at its Littlejohns works near Roche in the Clay Country, due by the end of 2026, which it says will cut its electricity use in Cornwall by 10%. Imerys says it supports around 3,500 jobs directly and indirectly.
  • Brewing and pubs (St Austell Brewery): St Austell Brewery, founded in 1851, has its registered office on Trevarthian Road in St Austell. It describes itself as the South West's leading brewing, hospitality and drinks wholesale business, with more than 2,000 employees and 45 managed pubs.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

St Austell is served by National Grid Electricity Distribution (South West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in St Austell

St Austell follows the national planning rules for England, decided by Cornwall council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • St Austell Conservation Area covers about 44.4 hectares of the town centre and holds 42 listed buildings, including the Grade I Holy Trinity Church and the Grade II* Market House, so roofs in the centre need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in St Austell could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,054 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 105,400 kWh a year
Used on site 70% at 24p = £17,707 saved
Exported 30% at 5p = £1,581 earned
Total a year About £19,288
Simple payback About 4.7 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in St Austell at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Cornwall

At the end of 2025, Cornwall had 34,740 solar PV installations with 683.0 MW of capacity, up 14% since 2020, according to government figures. The Cornwall page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in St Austell?

National Grid Electricity Distribution (South West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in St Austell?

About 105,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £19,288 a year. Your own roof, orientation and use will change this.

Can a business in St Austell get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for