Skip to content
CommercialSolarSurveys.com

Commercial solar panel installers in Stourbridge

Looking for commercial solar panel installers in Stourbridge? We match businesses here with one MCS certified installer for a free site survey, on site or by video call. Stourbridge is home to Stambermill and Timmis Road, Lye.

Key facts

Council area Dudley
Population 56,950 (Stourbridge built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5))
Network operator National Grid Electricity Distribution (West Midlands licence area)
Main employment areas Stambermill; Timmis Road, Lye
Indicative yield About 944 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Stourbridge

  • Stambermill: Stambermill (north) and Stambermill (south) each scored 29 in the 2021 Black Country Employment Area Review, which recommends both as Local Employment Areas.
  • Timmis Road, Lye: Dudley's Local Plan allocates 0.59 hectares of land off Timmis Road in Lye for about 2,300 square metres of new employment floorspace.

Large employers and sectors with sites here include:

  • Glassmaking: Stourbridge gives its name to the glass made in and around the town since the early 1600s, and the International Festival of Glass is held at Ruskin Mill in Stourbridge every two years.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Stourbridge is served by National Grid Electricity Distribution (West Midlands licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Stourbridge

Stourbridge follows the national planning rules for England, decided by Dudley council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Stourbridge has several conservation areas, among them the High Street, the Stourbridge Branch Canal, Wollaston and two in Oldswinford (Love Lane and Church Road), so check whether a building is inside one before planning roof panels.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Stourbridge could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 944 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 94,400 kWh a year
Used on site 70% at 24p = £15,859 saved
Exported 30% at 5p = £1,416 earned
Total a year About £17,275
Simple payback About 5.2 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Choosing a commercial solar installer in Stourbridge

Whichever commercial solar panel company, contractor or installer you talk to in Stourbridge, the checks that matter are the same:

  • Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with National Grid Electricity Distribution.
  • Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
  • A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
  • Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.

Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Stourbridge sites with.

Funding and support

We found no council or regional grant for business solar open in Stourbridge at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Dudley

At the end of 2025, Dudley had 4,867 solar PV installations with 22.1 MW of capacity, up 90% since 2020, according to government figures. The Dudley page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Stourbridge?

National Grid Electricity Distribution (West Midlands licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Stourbridge?

About 94,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,275 a year. Your own roof, orientation and use will change this.

How do I choose a commercial solar installer in Stourbridge?

Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with National Grid Electricity Distribution), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.

Can a business in Stourbridge get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for