Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Stroud

Stroud is home to Bath Road Industrial Estate, Rodborough, Fromeside Industrial Estate and Salmon Springs Industrial Estate. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Stroud
Population 26,080 (Stroud built-up area, usual residents, Census 2021 (ONS))
Network operator National Grid Electricity Distribution (West Midlands)
Main employment areas Bath Road Industrial Estate, Rodborough; Fromeside Industrial Estate; Salmon Springs Industrial Estate
Indicative yield About 999 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Stroud

  • Bath Road Industrial Estate, Rodborough: Employment area of about 6.4 hectares with a listed mill complex, terraced industrial units and accommodation for a major occupier, with an Aldi foodstore on the main road frontage, according to Stroud District Council's 2021 Employment Land Review.
  • Fromeside Industrial Estate: Small estate of about 1.4 hectares of terraced industrial units on Dr Newton's Way, centrally located in Stroud next to the canal; the council's 2021 review found all its land and premises in use.
  • Salmon Springs Industrial Estate: Edge of town estate of about 2.1 hectares on Painswick Road made up of several mill properties, which the council's 2021 review said could be refurbished and subdivided further.

Large employers and sectors with sites here include:

  • Sports textiles (WSP Textiles): WSP Textiles has its headquarters at Lodgemore Mills, Stroud, which the Strachan family bought in 1865 and which is still operational, making coverings for tennis balls and snooker and pool tables. In March 2026 more than 50 workers at its Stroud and Cam sites accepted a two year pay deal.
  • Manufacturing: Stroud District Council's 2021 Employment Land Review found manufacturing employed 9,500 people in the district in 2018, 18.3% of all jobs, with strengths in electronic and optical products, machinery, fabricated metal products and food production.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Stroud is served by National Grid Electricity Distribution (West Midlands). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Stroud

Stroud follows the national planning rules for England, decided by Stroud council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Many of Stroud's valley mills lie in the Industrial Heritage Conservation Area or its neighbouring conservation areas, such as Lodgemore and Fromehall, Ebley Mills and Stroud Station, which the council's 2008 management proposals cover, including guidance on re-using historic mill buildings, so check before planning panels on a mill roof.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Stroud could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 999 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 99,900 kWh a year
Used on site 70% at 24p = £16,783 saved
Exported 30% at 5p = £1,499 earned
Total a year About £18,282
Simple payback About 4.9 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Stroud at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Stroud

At the end of 2025, Stroud had 5,658 solar PV installations with 73.1 MW of capacity, up 27% since 2020, according to government figures. The Stroud page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Stroud?

National Grid Electricity Distribution (West Midlands). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Stroud?

About 99,900 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,282 a year. Your own roof, orientation and use will change this.

Can a business in Stroud get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for