Key facts
| Council area | Bassetlaw |
| Population | 43,440 (Worksop built-up area, Census 2021 (ONS)) |
| Network operator | National Grid Electricity Distribution (East Midlands) |
| Main employment areas | Manton Wood Enterprise Park; Manton Wood Distribution Park; Claylands Industrial Estate |
| Indicative yield | About 974 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Worksop
- Manton Wood Enterprise Park: Business park on the former Manton Colliery site off Retford Road, south of the railway, with several large industrial and storage units. Greencore's sandwich factory is here.
- Manton Wood Distribution Park: A 63 acre site on the south side of Worksop with a new junction onto the A57, about 1.5 miles from the A1. 25 acres have outline permission for up to 1,000,000 sq ft of employment use.
- Claylands Industrial Estate: Established industrial estate on Claylands Avenue, next to the A57 and Gateford Road and the Gateford residential area.
Large employers and sectors with sites here include:
- Food manufacturing (Greencore): Greencore's Manton Wood site makes sandwiches and wraps for major retailers, convenience stores and discounters, and employs about 1,700 people.
- Logistics: Manton Wood Distribution Park can take a single building of up to 1 million sq ft for manufacturing or logistics, about 11 miles from the M1.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Worksop is served by National Grid Electricity Distribution (East Midlands). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Worksop
Worksop follows the national planning rules for England, decided by Bassetlaw council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- The Worksop Conservation Area, enlarged and designated in its current form on 16 June 2010, covers about 0.65 square kilometres and over 1,000 buildings, and contains over 60 listed buildings, the second highest of any conservation area in Bassetlaw.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Worksop could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 974 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 97,400 kWh a year |
| Used on site | 70% at 24p = £16,363 saved |
| Exported | 30% at 5p = £1,461 earned |
| Total a year | About £17,824 |
| Simple payback | About 5.0 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
We found no council or regional grant for business solar open in Worksop at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Bassetlaw
At the end of 2025, Bassetlaw had 6,047 solar PV installations with 200.9 MW of capacity, up 52% since 2020, according to government figures. The Bassetlaw page has the full local figures and how they compare.
Nearby towns
- Retford, about 7 miles away
- Mansfield, about 11 miles away
- Rotherham, about 13 miles away
- Chesterfield, about 14 miles away
Sources
- en.wikipedia.org: List of ONS built up areas in England
- bassetlaw.gov.uk: bsworksop
- invest.southyorkshire-ca.gov.uk: manton wood distribution park
- careers.greencore.com: nottinghamshire
- data.bassetlaw.gov.uk: worksopcaaapril2011revised
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Worksop?
National Grid Electricity Distribution (East Midlands). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Worksop?
About 97,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,824 a year. Your own roof, orientation and use will change this.
Can a business in Worksop get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Bassetlaw6,047 installations, 200.9 MW of solar and about 982 kWh per kWp a year for a south-facing roof.
- East MidlandsNGED connections, Golden Triangle logistics, Lincolnshire farming and food processing, Derby manufacturing and the Nottingham Workplace Parking Levy.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.