Commercial solar installers in Aberdare

Aberdare is home to Hirwaun Industrial Estate, Cwmbach Industrial Estate and Robertstown. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Rhondda Cynon Taf
Population 37,675 (Aberdare built-up area, usual residents, Census 2021 (ONS))
Network operator National Grid Electricity Distribution (South Wales)
Main employment areas Hirwaun Industrial Estate; Cwmbach Industrial Estate; Robertstown
Indicative yield About 924 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Aberdare

  • Hirwaun Industrial Estate: Industrial estate about four miles west of Aberdare town centre near the A465. In March 2026 the Welsh Government said it had bought its 97,300 sq ft Unit 1, with six acres of development land, and is investing up to £9.25 million to refurbish it for manufacturers under its Tech Valleys programme.
  • Cwmbach Industrial Estate: Trade counter and light industrial estate on the A4059 close to the centre of Aberdare, next to Cwmbach station, owned by Mileway, with newly built units that have three phase power.
  • Robertstown: Rhondda Cynon Taf Council developed 20 modern industrial units at Robertstown, Aberdare, with European Regional Development Fund support, ranging from about 1,000 to 1,700 sq ft.

Large employers and sectors with sites here include:

  • Concrete products and housebuilding (W.D. Lewis): Aberdare based W.D. Lewis, a family owned housebuilding and manufacturing group, said in August 2023 that it had over 200 employees and was installing a block making plant able to produce 27,000 blocks a day.
  • Engineering (Printing Components): Printing Components, which makes printing rollers and parts for the agriculture and machinery sectors from its Aberdare hub, was bought out by local owners in June 2022, safeguarding 20 jobs.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Aberdare is served by National Grid Electricity Distribution (South Wales). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Aberdare

Planning in Aberdare is decided by Rhondda Cynon Taf council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • The Aberdare Conservation Area, designated in 1989, covers the Victorian core of the town centre, and Article 4 Directions remove some permitted development rights for both commercial and residential properties there, so check with the council before fitting panels in the centre.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Aberdare could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 924 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 92,400 kWh a year
Used on site 70% at 24p = £15,523 saved
Exported 30% at 5p = £1,386 earned
Total a year About £16,909
Simple payback About 5.3 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Loans of £1,000 to £1.5m at a discounted fixed interest rate (never below 3%) for energy efficiency and low carbon projects, with solar PV listed as a typical eligible project. Businesses must be based in Wales and have traded for at least two years with filed accounts. A grant of up to 50% of the cost of a detailed energy audit, to a maximum of £10,000, is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Rhondda Cynon Taf

At the end of 2025, Rhondda Cynon Taf had 7,233 solar PV installations with 70.3 MW of capacity, up 62% since 2020, according to government figures. The Rhondda Cynon Taf page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Aberdare?

National Grid Electricity Distribution (South Wales). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Aberdare?

About 92,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £16,909 a year. Your own roof, orientation and use will change this.

Can a business in Aberdare get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for