Commercial solar installers in Llanelli

Llanelli is home to Dafen Industrial Estate, Trostre Industrial Park and Bynea Business Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Carmarthenshire
Population 42,175 (Llanelli built-up area, Census 2021)
Network operator National Grid Electricity Distribution (South Wales)
Main employment areas Dafen Industrial Estate; Trostre Industrial Park; Bynea Business Park; Pentre Awel
Indicative yield About 1,028 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Llanelli

  • Dafen Industrial Estate: Established estate first built by the Welsh Development Agency, about a mile north-east of the town centre and four miles from M4 junction 48.
  • Trostre Industrial Park: Industrial units on the east side of town near Trostre Retail Park and the Trostre tinplate works.
  • Bynea Business Park: Off Heol Y Bwlch (B4297), about 2.5 miles east of Llanelli town centre.
  • Pentre Awel: Carmarthenshire Council's health and wellbeing development at Delta Lakes. It includes business incubation space for healthcare technology, expected to be ready for occupation in 2026.

Large employers and sectors with sites here include:

  • Steel packaging: Tata Steel Trostre: The UK's tinplate works, making tin, chrome and polymer-coated packaging steel. It kept its BRCGS AA+ food packaging safety grade in February 2026.
  • Healthcare: Prince Philip Hospital (Hywel Dda University Health Board): General hospital in Llanelli run by Hywel Dda University Health Board.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Llanelli is served by National Grid Electricity Distribution (South Wales). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Llanelli

Planning in Llanelli is decided by Carmarthenshire council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • The town centre has the Llanelli Conservation Area, designated in 1971. A council-commissioned appraisal and management plan covers it.
  • The Burry Inlet (Loughor estuary) beside the town is a Special Protection Area, a Ramsar site and part of a Special Area of Conservation.

Our guides on listed buildings and conservation areas, bats, birds and ecology explain what these mean for a solar project.

What a business roof in Llanelli could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,028 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 102,800 kWh a year
Used on site 70% at 24p = £17,270 saved
Exported 30% at 5p = £1,542 earned
Total a year About £18,812
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Loans of £1,000 to £1.5m for energy efficiency and decarbonisation, including solar PV, funded by the Welsh Government and the Development Bank of Wales. The fund was extended to £20 million, with funding available until 2028. Business Wales energy audit grants cover up to 50% of costs. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Carmarthenshire

At the end of 2025, Carmarthenshire had 10,214 solar PV installations with 210.0 MW of capacity, up 79% since 2020, according to government figures. The Carmarthenshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Llanelli?

National Grid Electricity Distribution (South Wales). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Llanelli?

About 102,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,812 a year. Your own roof, orientation and use will change this.

Can a business in Llanelli get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for