Key facts
| Council area | Moray |
| Population | 24,640 (Elgin locality, Scotland's Census 2022 (NRS figure as quoted by Wikipedia)) |
| Network operator | SSEN Distribution (Scottish Hydro Electric Power Distribution, North of Scotland licence area) |
| Main employment areas | Elgin Business Park (Barmuckity); Chanonry Industrial Estate; Tyock Industrial Estate |
| Indicative yield | About 868 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in Scotland |
Where businesses are in Elgin
- Elgin Business Park (Barmuckity): A business park of about 30 hectares at the eastern entrance to Elgin, reached from the A96 by a new roundabout; Moray Council approved a framework for business, industrial, retail, leisure and housing uses there. Its first approved project was a 61 bedroom Travelodge in 2018.
- Chanonry Industrial Estate: Industrial estate where Moray Council lets workshop units on Chanonry Road South and Chanonry Spur and small office and storage units at Chanonry Business Centre on Chanonry Road North.
- Tyock Industrial Estate: Established Elgin industrial estate where Moray Council also lets industrial units.
Large employers and sectors with sites here include:
- Textiles (Johnstons of Elgin): Johnstons of Elgin, founded in 1797, makes cashmere and fine wool knitwear, accessories and cloth at its Elgin mill, which also has a visitor centre, and its Hawick mill; it employed about 1,100 people in August 2025.
- Healthcare (Dr Gray's Hospital): NHS Grampian is rebuilding consultant-led maternity care at Dr Gray's Hospital in Elgin; in June 2025 it had recruited 80% of the staff needed, backed by over £6 million of Scottish Government funding, with a target of the end of 2026.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Elgin is served by SSEN Distribution (Scottish Hydro Electric Power Distribution, North of Scotland licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Elgin
Planning in Elgin is decided by Moray council under Scotland's own system. Non-domestic rooftop solar is often permitted development under the Scottish rules, but not on listed buildings, in National Scenic Areas or within 3 km of an aerodrome.
Points that come up locally:
- Elgin has two conservation areas, Elgin High Street (about 19 hectares, 78 postcodes) and Elgin South (about 15.7 hectares), so check whether a building is inside one before planning roof panels in the centre.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Elgin could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 868 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 86,800 kWh a year |
| Used on site | 70% at 24p = £14,582 saved |
| Exported | 30% at 5p = £1,302 earned |
| Total a year | About £15,884 |
| Simple payback | About 5.7 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Funding and support
- Business Energy Scotland SME Loan: Interest-free loans of £1,000 to £130,000. Cashback of 75% of eligible costs, up to £20,000 for energy efficiency measures and up to £10,000 for heat pumps, biomass boilers and solar thermal, with a maximum of £30,000 per business. Applications are processed on a rolling basis all year round, subject to loan funds. The page says the scheme is not accepting new applications for solar PV projects. Check the scheme's own page for eligibility and closing dates.
National reliefs apply too: see grants and reliefs in Scotland.
Solar across Moray
At the end of 2025, Moray had 4,942 solar PV installations with 21.9 MW of capacity, up 127% since 2020, according to government figures. The Moray page has the full local figures and how they compare.
Nearby towns
- Forres, about 11 miles away
- Inverness, about 36 miles away
- Fraserburgh, about 48 miles away
- Wick, about 55 miles away
Sources
- en.wikipedia.org: Elgin, Moray
- citypopulation.de: S52000236 elgin
- newsroom.moray.gov.uk: approval for elgin business park framework
- newsroom.moray.gov.uk: travelodge approved at elgin business park
- moray.gov.uk: commercial propertiessites for lease
- ukft.org: member spotlight johnstons of elgin opens ps1 6m
- news.stv.tv: health secretary neil gray confident full maternity care
- revenue.scot: designation inverness cromarty green freeport tax
- heritagecheck.co.uk: elgin high street
- heritagecheck.co.uk: elgin south
- thegazette.co.uk
- businessenergyscotland.org: sme loan
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Elgin?
SSEN Distribution (Scottish Hydro Electric Power Distribution, North of Scotland licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Elgin?
About 86,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,884 a year. Your own roof, orientation and use will change this.
Can a business in Elgin get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Moray4,942 installations, 21.9 MW of solar and about 804 kWh per kWp a year for a south-facing roof.
- ScotlandSP Energy Networks and SSEN connections, NPF4 and Scottish permitted development, the four city low emission zones, the Scottish rates exemption and realistic yields.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- ScotlandCurrent solar support in Scotland for businesses, community groups, public bodies, schools and farms, with rates, planning and official contacts.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.