Commercial solar installers in Forres

Forres is home to Enterprise Park Forres and Waterford Circle. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Moray
Population 9,296 (Forres locality, Scotland's Census 2022 (NRS figure as published by City Population; South Forres is a separate locality of 777))
Network operator SSEN Distribution (Scottish Hydro Electric Power Distribution, North of Scotland licence area)
Main employment areas Enterprise Park Forres; Waterford Circle
Indicative yield About 835 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Scotland

Where businesses are in Forres

  • Enterprise Park Forres: Highlands and Islands Enterprise's business park on the outskirts of Forres with direct A96 access, developed over 25 years. HIE opened two new 150 sqm units in June 2026 after a £1.2m investment, and the Manufacturing Innovation Centre Moray has opened there.
  • Waterford Circle: Moray Council business park where the council built four factory units in 2013 to 2014 and five more (500 sqm) by 2016, after which it said the estate would be effectively fully developed and fully let.

Large employers and sectors with sites here include:

  • Whisky (Benromach Distillery): Gordon & MacPhail finished a warehouse expansion at its Benromach Distillery in August 2025, adding three warehouses; the last, Warehouse 10, holds about 9,000 casks and raised maturation capacity by more than 25%.
  • Manufacturing and marine businesses (Enterprise Park Forres): HIE says occupiers at Enterprise Park Forres include Gael Force Marine, Phoenix Instinct and Moray Waste Busters, across manufacturing, marine and data.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Forres is served by SSEN Distribution (Scottish Hydro Electric Power Distribution, North of Scotland licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Forres

Planning in Forres is decided by Moray council under Scotland's own system. Non-domestic rooftop solar is often permitted development under the Scottish rules, but not on listed buildings, in National Scenic Areas or within 3 km of an aerodrome.

Points that come up locally:

  • The Forres Conservation Area covers about 63.4 hectares of the town, so check whether a building is inside it before planning roof panels in the centre.
  • Since 24 May 2024, Scotland's Class 6J lets solar PV go on non-domestic buildings without planning permission if it protrudes no more than 1 metre, but not on a listed building or within its curtilage, within 3 km of an aerodrome or technical site, or, in a conservation area, on the principal elevation or a side elevation fronting a road.

Our guides on listed buildings and conservation areas, airports, glint and glare explain what these mean for a solar project.

What a business roof in Forres could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 835 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 83,500 kWh a year
Used on site 70% at 24p = £14,028 saved
Exported 30% at 5p = £1,253 earned
Total a year About £15,280
Simple payback About 5.9 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Business Energy Scotland SME Loan: Interest-free loans of £1,000 to £130,000. Cashback of 75% of eligible costs, up to £20,000 for energy efficiency measures and up to £10,000 for heat pumps, biomass boilers and solar thermal, with a maximum of £30,000 per business. Applications are processed on a rolling basis all year round, subject to the overall availability of loan funds. The page says the scheme is not accepting new applications for solar PV projects. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Scotland.

Solar across Moray

At the end of 2025, Moray had 4,942 solar PV installations with 21.9 MW of capacity, up 127% since 2020, according to government figures. The Moray page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Forres?

SSEN Distribution (Scottish Hydro Electric Power Distribution, North of Scotland licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Forres?

About 83,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,280 a year. Your own roof, orientation and use will change this.

Can a business in Forres get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for