Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Wick

Wick is home to Wick Business Park and Wick Harbour. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Highland
Population 6,913 (Wick locality, Scotland's Census 2022 (NRS figure as published by City Population))
Network operator SSEN Distribution (Scottish Hydro Electric Power Distribution, North of Scotland licence area)
Main employment areas Wick Business Park; Wick Harbour
Indicative yield About 827 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Scotland

Where businesses are in Wick

  • Wick Business Park: Highlands and Islands Enterprise's business park on the north-west edge of Wick beside Wick John O'Groats Airport, off the A99. A £2.25m second phase of four 122 square metre units was due for completion at the end of 2025, and HIE consulted on further development in August and September 2025.
  • Wick Harbour: A commercial port run by Wick Harbour Authority, with a Commercial Quay handling cargoes such as timber, road salt and onshore wind components, heavy lift pads installed in 2014, and the operations and maintenance base for the Beatrice Offshore Windfarm.

Large employers and sectors with sites here include:

  • Offshore wind operations (Beatrice Offshore Windfarm): The Beatrice Offshore Windfarm, 84 Siemens Gamesa 7MW turbines about 13.5 km off the Caithness coast, is run from an operations and maintenance base in Wick Harbour with about 70 full-time equivalent roles in Wick.
  • Whisky distilling (Old Pulteney): The Old Pulteney distillery has distilled whisky in Wick since 1826.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Wick is served by SSEN Distribution (Scottish Hydro Electric Power Distribution, North of Scotland licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Wick

Planning in Wick is decided by Highland council under Scotland's own system. Non-domestic rooftop solar is often permitted development under the Scottish rules, but not on listed buildings, in National Scenic Areas or within 3 km of an aerodrome.

Points that come up locally:

  • The Wick Pulteneytown Conservation Area, Thomas Telford's planned town, was enlarged from 1 September 2021 and takes in Argyle Square and the harbour area, so business roofs there may need permission before panels go on.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Wick could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 827 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 82,700 kWh a year
Used on site 70% at 24p = £13,894 saved
Exported 30% at 5p = £1,241 earned
Total a year About £15,134
Simple payback About 5.9 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Business Energy Scotland SME Loan: Interest-free loans of £1,000 to £130,000. Cashback of 75% of eligible costs, up to £20,000 for energy efficiency measures and up to £10,000 for heat pumps, biomass boilers and solar thermal, with a maximum of £30,000 per business. Applications are processed on a rolling basis all year round, subject to the overall availability of loan funds. The page says the scheme is not accepting new applications for solar PV projects. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Scotland.

Solar across Highland

At the end of 2025, Highland had 13,409 solar PV installations with 50.7 MW of capacity, up 168% since 2020, according to government figures. The Highland page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Wick?

SSEN Distribution (Scottish Hydro Electric Power Distribution, North of Scotland licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Wick?

About 82,700 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £15,134 a year. Your own roof, orientation and use will change this.

Can a business in Wick get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for