Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Huddersfield

Huddersfield is home to Lindley Moor (Summit 24 Business Park), Park Valley Mills, Lockwood and Fieldhouse Business Park, Leeds Road. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Kirklees
Population 141,675 (Huddersfield built-up area, Census 2021 (ONS))
Network operator Northern Powergrid (Yorkshire)
Main employment areas Lindley Moor (Summit 24 Business Park); Park Valley Mills, Lockwood; Fieldhouse Business Park, Leeds Road
Enterprise or investment zone Leeds City Region Enterprise Zone (M62 corridor): Lindley Moor East and West sites, Huddersfield
Indicative yield About 925 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Huddersfield

  • Lindley Moor (Summit 24 Business Park): Enterprise Zone employment land by junction 24 of the M62. Lindley Moor West is developed and occupied by Lesjofors Springs, Rybrook and Mac's Trucks; Lindley Moor East is a further 6.3 hectare site.
  • Park Valley Mills, Lockwood: A 13 acre historic mill site off Meltham Road redeveloped into modern industrial units with office and storage space.
  • Fieldhouse Business Park, Leeds Road: A £7m business park off the A62 Leeds Road, close to the John Smith's Stadium trade counter area.

Large employers and sectors with sites here include:

  • Engineering (Cummins Turbo Technologies): Cummins Turbo Technologies has its European headquarters and technical centre on St Andrew's Road, and has fitted 256 solar panels there.
  • Gear manufacturing (David Brown Santasalo): David Brown Santasalo makes gears and gearboxes at Park Works, its largest UK gear manufacturing site, and listed among the top Kirklees companies in 2024.
  • Higher education (University of Huddersfield): The University of Huddersfield is described as the town's largest employer.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Enterprise, investment and freeport zones

  • Leeds City Region Enterprise Zone (M62 corridor): Lindley Moor East and West sites, Huddersfield: Enterprise Zone designations run to 2042 according to the Combined Authority's enterprise zones page.

These zones can bring business rates relief or enhanced capital allowances for eligible firms on qualifying sites; check the current terms with the zone before relying on them.

Grid connection

Huddersfield is served by Northern Powergrid (Yorkshire). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Huddersfield

Huddersfield follows the national planning rules for England, decided by Kirklees council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • Almost all of the centre inside the A62 ring road is the Huddersfield Town Centre Conservation Area, designated in 1981 and on Historic England's Heritage at Risk Register since 2020.
  • Green Belt covers about 70% of Kirklees outside the national park, so ground-mounted schemes on the edge of town face Green Belt policy.
  • About 11% of Kirklees lies inside the Peak District National Park, to the south west of the town, where the national park authority decides planning.

Our guides on listed buildings and conservation areas, green belt, national parks and National Landscapes explain what these mean for a solar project.

What a business roof in Huddersfield could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 925 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 92,500 kWh a year
Used on site 70% at 24p = £15,540 saved
Exported 30% at 5p = £1,388 earned
Total a year About £16,928
Simple payback About 5.3 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Huddersfield at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Kirklees

At the end of 2025, Kirklees had 9,790 solar PV installations with 40.9 MW of capacity, up 75% since 2020, according to government figures. The Kirklees page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Huddersfield?

Northern Powergrid (Yorkshire). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Huddersfield?

About 92,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £16,928 a year. Your own roof, orientation and use will change this.

Can a business in Huddersfield get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for