Commercial solar installers in Aberystwyth

Aberystwyth is home to Glanyrafon Industrial Estate, Llanbadarn Fawr and AberInnovation (Aberystwyth Innovation and Enterprise Campus), Gogerddan. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Ceredigion
Population 14,640 (Aberystwyth built-up area, usual residents, Census 2021 (ONS))
Network operator SP Energy Networks (SP Manweb, Merseyside and North Wales licence area)
Main employment areas Glanyrafon Industrial Estate, Llanbadarn Fawr; AberInnovation (Aberystwyth Innovation and Enterprise Campus), Gogerddan
Indicative yield About 948 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Aberystwyth

  • Glanyrafon Industrial Estate, Llanbadarn Fawr: Built in the 1970s on the south bank of the River Rheidol about two miles south east of the town centre, covering roughly 700 by 500 metres. Wales's national heritage record lists units including the Post Office depot, Rachel's Organic, a plumbing centre and Screwfix.
  • AberInnovation (Aberystwyth Innovation and Enterprise Campus), Gogerddan: Innovation campus on Aberystwyth University's Gogerddan site with pilot scale facilities for food and drink, the circular economy and agri-tech, including a Biorefining Centre, Future Food Centre, Seed Biobank and offices and labs to hire.

Large employers and sectors with sites here include:

  • Higher education (Aberystwyth University): Aberystwyth University was founded in 1872 as the first university college in Wales. A report for Universities Wales in October 2021 found that universities in Ceredigion contributed £135m a year to the county's economy and supported 3,303 jobs there.
  • Dairy (Rachel's Organic): In November 2023 Rachel's, a subsidiary of Lactalis, was making its organic yoghurts at its Aberystwyth site, with organic milk delivered daily and spare capacity it hoped to fill; the brand produced about 6,000 tonnes of yoghurt a year.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Aberystwyth is served by SP Energy Networks (SP Manweb, Merseyside and North Wales licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Aberystwyth

Planning in Aberystwyth is decided by Ceredigion council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • The Aberystwyth Conservation Area, designated in 1969 and extended in 1980, 1981 and 1984, holds 249 listed buildings, according to the council's June 2025 appraisal, so check a building's status before planning roof panels in the centre.
  • In Wales, roof panels on a non-domestic building are usually permitted development if they stand no more than 200mm proud of the roof, but in a conservation area panels on a principal or side elevation wall visible from a highway need planning consent, and a listed building needs planning permission and listed building consent.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Aberystwyth could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 948 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 94,800 kWh a year
Used on site 70% at 24p = £15,926 saved
Exported 30% at 5p = £1,422 earned
Total a year About £17,348
Simple payback About 5.2 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Discounted fixed interest rate loans for energy efficiency measures and low carbon projects, with renewables including solar PV listed as eligible projects. Limited companies, sole traders and partnerships must be based in Wales, have traded for at least two years and have at least one set of filed annual accounts. A grant of up to 50% of the cost of a detailed energy audit, to a maximum of £10,000 (£20,000 total costs), is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Ceredigion

At the end of 2025, Ceredigion had 6,069 solar PV installations with 54.4 MW of capacity, up 67% since 2020, according to government figures. The Ceredigion page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Aberystwyth?

SP Energy Networks (SP Manweb, Merseyside and North Wales licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Aberystwyth?

About 94,800 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,348 a year. Your own roof, orientation and use will change this.

Can a business in Aberystwyth get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for