Commercial solar installers in Ammanford

Ammanford is home to Parc Hendre (Capel Hendre Industrial Estate) and Cilyrychen Industrial Estate. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Carmarthenshire
Population 8,285 (Ammanford built-up area, usual residents, Census 2021 (ONS))
Network operator National Grid Electricity Distribution (South Wales licence area)
Main employment areas Parc Hendre (Capel Hendre Industrial Estate); Cilyrychen Industrial Estate
Indicative yield About 939 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Ammanford

  • Parc Hendre (Capel Hendre Industrial Estate): Well established industrial estate about three miles south west of Ammanford, served by the A483 to junction 49 of the M4, where Carmarthenshire Council sells serviced plots for manufacturing and other B1, B2 and B8 uses. Window maker Victorian Sliders is based there.
  • Cilyrychen Industrial Estate: Industrial estate near Ammanford at Llandybie, where steel fabricator Morgan Marine bought a vacant Welsh Government factory in 2025 and planned a £1.25 million refurbishment.

Large employers and sectors with sites here include:

  • Window manufacturing (Victorian Sliders): Victorian Sliders makes PVC-U vertical sliding sash windows at a site of about 240,000 sq ft near Ammanford, extruding its own profiles, making glass units and running an in-house recycling plant.
  • Steel fabrication (Morgan Marine): Morgan Marine, which marks 60 years in business in 2025, employed 211 people in February 2025 and planned 20 new jobs over three years at its Cilyrychen site, where it said it may add solar panels and wind turbines.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Ammanford is served by National Grid Electricity Distribution (South Wales licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Ammanford

Planning in Ammanford is decided by Carmarthenshire council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • In Wales, roof panels on a non-domestic building should project no more than 200mm from the roof, stay at least 1 metre from the roof edge and, on a flat roof, rise no more than 1 metre, but a listed building needs planning permission and listed building consent, and in a conservation area panels on a principal or side elevation wall visible from the highway need planning consent.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Ammanford could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 939 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 93,900 kWh a year
Used on site 70% at 24p = £15,775 saved
Exported 30% at 5p = £1,409 earned
Total a year About £17,184
Simple payback About 5.2 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Discounted fixed interest rate green business loans for energy efficiency measures and low carbon projects, with renewables including solar PV listed as typical eligible projects; capital repayment holidays are available and the loan term is linked to the project's payback. Limited companies, sole traders and partnerships must be based in Wales, have traded for at least two years and have at least one set of filed annual accounts. A grant of up to 50% of the cost of a detailed energy audit by an accredited independent expert, to a maximum of £10,000 (£20,000 total costs), is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Carmarthenshire

At the end of 2025, Carmarthenshire had 10,214 solar PV installations with 210.0 MW of capacity, up 79% since 2020, according to government figures. The Carmarthenshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Ammanford?

National Grid Electricity Distribution (South Wales licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Ammanford?

About 93,900 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,184 a year. Your own roof, orientation and use will change this.

Can a business in Ammanford get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for