Skip to content
CommercialSolarSurveys.com

Commercial solar panel installers in Ely

Looking for commercial solar panel installers in Ely? We match businesses here with one MCS certified installer for a free site survey, on site or by video call. Ely is home to Lancaster Way Business Park and Cambridgeshire Business Park, Angel Drove.

Key facts

Council area East Cambridgeshire
Population 19,185 (Ely built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5))
Network operator UK Power Networks (Eastern Power Networks licence area)
Main employment areas Lancaster Way Business Park; Cambridgeshire Business Park, Angel Drove
Indicative yield About 1,032 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Ely

  • Lancaster Way Business Park: Business park just outside Ely, about a mile off the A10, described in 2017 as Ely's largest business park. East Cambridgeshire District Council says its Phase 2 land is part of the Cambridge Compass Enterprise Zone, with freehold land for sale and 24 hour manned security.
  • Cambridgeshire Business Park, Angel Drove: Business park on Angel Drove on Ely's eastern side. A planning application validated in April 2026 seeks a B8 warehouse with offices on land south east of the park, and was still under consideration in November 2026.

Large employers and sectors with sites here include:

  • Surgical robotics (CMR Surgical): CMR Surgical opened a 7,000 square metre manufacturing site in Ely in October 2023 after a £10 million investment; it is home to the design and build of the Versius surgical robot and can produce up to 500 systems a year.
  • Heritage tourism (Ely Cathedral): Ely Cathedral, the city's main visitor attraction, reported total income of £4.3 million and 131 employees for the year to 31 December 2025 in its charity filings.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Sector guides for Ely sites

  • Warehouses and logistics: Distribution and warehouse units at Cambridgeshire Business Park, Angel Drove usually have the large, simple roofs that suit solar best. See solar for warehouses and distribution sites for cost by roof size, how much roof each kWp needs and payback.

Grid connection

Ely is served by UK Power Networks (Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Ely

Ely follows the national planning rules for England, decided by East Cambridgeshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Ely Conservation Area, designated in 1972, is large (about 199.3 hectares) and holds 190 listed buildings, 25 of them Grade I including the Cathedral, so many roofs in and around the city centre need more care before panels go on.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Ely could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,032 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 103,200 kWh a year
Used on site 70% at 24p = £17,338 saved
Exported 30% at 5p = £1,548 earned
Total a year About £18,886
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Choosing a commercial solar installer in Ely

Whichever commercial solar panel company, contractor or installer you talk to in Ely, the checks that matter are the same:

  • Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with UK Power Networks.
  • Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
  • A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
  • Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.

Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Ely sites with.

Funding and support

We found no council or regional grant for business solar open in Ely at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across East Cambridgeshire

At the end of 2025, East Cambridgeshire had 4,321 solar PV installations with 295.6 MW of capacity, up 107% since 2020, according to government figures. The East Cambridgeshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Ely?

UK Power Networks (Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Ely?

About 103,200 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,886 a year. Your own roof, orientation and use will change this.

How do I choose a commercial solar installer in Ely?

Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with UK Power Networks), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.

Can a business in Ely get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for