Key facts
| Council area | East Cambridgeshire |
| Population | 19,185 (Ely built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5)) |
| Network operator | UK Power Networks (Eastern Power Networks licence area) |
| Main employment areas | Lancaster Way Business Park; Cambridgeshire Business Park, Angel Drove |
| Indicative yield | About 1,032 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Ely
- Lancaster Way Business Park: Business park just outside Ely, about a mile off the A10, described in 2017 as Ely's largest business park. East Cambridgeshire District Council says its Phase 2 land is part of the Cambridge Compass Enterprise Zone, with freehold land for sale and 24 hour manned security.
- Cambridgeshire Business Park, Angel Drove: Business park on Angel Drove on Ely's eastern side. A planning application validated in April 2026 seeks a B8 warehouse with offices on land south east of the park, and was still under consideration in November 2026.
Large employers and sectors with sites here include:
- Surgical robotics (CMR Surgical): CMR Surgical opened a 7,000 square metre manufacturing site in Ely in October 2023 after a £10 million investment; it is home to the design and build of the Versius surgical robot and can produce up to 500 systems a year.
- Heritage tourism (Ely Cathedral): Ely Cathedral, the city's main visitor attraction, reported total income of £4.3 million and 131 employees for the year to 31 December 2025 in its charity filings.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Sector guides for Ely sites
- Warehouses and logistics: Distribution and warehouse units at Cambridgeshire Business Park, Angel Drove usually have the large, simple roofs that suit solar best. See solar for warehouses and distribution sites for cost by roof size, how much roof each kWp needs and payback.
Grid connection
Ely is served by UK Power Networks (Eastern Power Networks licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Ely
Ely follows the national planning rules for England, decided by East Cambridgeshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- The Ely Conservation Area, designated in 1972, is large (about 199.3 hectares) and holds 190 listed buildings, 25 of them Grade I including the Cathedral, so many roofs in and around the city centre need more care before panels go on.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Ely could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,032 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 103,200 kWh a year |
| Used on site | 70% at 24p = £17,338 saved |
| Exported | 30% at 5p = £1,548 earned |
| Total a year | About £18,886 |
| Simple payback | About 4.8 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Choosing a commercial solar installer in Ely
Whichever commercial solar panel company, contractor or installer you talk to in Ely, the checks that matter are the same:
- Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with UK Power Networks.
- Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
- A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
- Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.
Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Ely sites with.
Funding and support
We found no council or regional grant for business solar open in Ely at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across East Cambridgeshire
At the end of 2025, East Cambridgeshire had 4,321 solar PV installations with 295.6 MW of capacity, up 107% since 2020, according to government figures. The East Cambridgeshire page has the full local figures and how they compare.
Nearby towns
- Newmarket, about 12 miles away
- March, about 13 miles away
- Wisbech, about 19 miles away
- Huntingdon, about 19 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- eastcambs.gov.uk: enterprise zones
- whitingsllp.co.uk: lancaster way business park ely business is booming
- plota.co.uk
- cic.vc: cmr surgical strengthens uk innovation ecosystem
- themanufacturer.com: meeting the demand for surgical robotics
- opencharities.uk: 1202546.md
- gov.uk: enterprise zones
- heritagecheck.co.uk: ely
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Ely?
UK Power Networks (Eastern Power Networks licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Ely?
About 103,200 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,886 a year. Your own roof, orientation and use will change this.
How do I choose a commercial solar installer in Ely?
Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with UK Power Networks), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.
Can a business in Ely get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- East Cambridgeshire4,321 installations, 295.6 MW of solar and about 1,031 kWh per kWp a year for a south-facing roof.
- East of EnglandUK Power Networks connections, strong yields, the Felixstowe and A14 logistics corridor, arable farming and food processing across Norfolk, Suffolk and the Fens.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.