Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Halifax

Halifax is home to Dean Clough, Holmfield Industrial Estate and Halifax Industrial Estate, Pellon Lane. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Calderdale
Population 88,115 (Halifax built-up area, Census 2021 (ONS))
Network operator Northern Powergrid (Yorkshire)
Main employment areas Dean Clough; Holmfield Industrial Estate; Halifax Industrial Estate, Pellon Lane; Lee Bridge Industrial Estate
Indicative yield About 922 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Halifax

  • Dean Clough: A 22 acre former carpet mill complex on the edge of the town centre, turned into a business park in the 1980s, with over 150 organisations and around 4,000 people working there.
  • Holmfield Industrial Estate: Industrial estate in the northern part of Halifax.
  • Halifax Industrial Estate, Pellon Lane: Trade counter and light industrial units on Pellon Lane, west of the centre.
  • Lee Bridge Industrial Estate: Small industrial units at Lee Bridge, HX3, beside Dean Clough.

Large employers and sectors with sites here include:

  • Banking (Lloyds Banking Group): Lloyds Banking Group's Trinity Road office is its main Yorkshire hub, with some 3,000 staff, after a £116m rebuild that reopened in December 2025.
  • Confectionery (Nestle): Nestle's Halifax factory makes Quality Street, After Eight, Rolo and Munchies and employs more than 550 people.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Halifax is served by Northern Powergrid (Yorkshire). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Halifax

Halifax follows the national planning rules for England, decided by Calderdale council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Halifax Town Centre Conservation Area was designated on 23 October 1974.
  • Green Belt surrounds the town; Calderdale's 2017 Green Belt review of the Halifax area found most parcels perform well against Green Belt purposes.

Our guides on listed buildings and conservation areas, green belt explain what these mean for a solar project.

What a business roof in Halifax could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 922 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 92,200 kWh a year
Used on site 70% at 24p = £15,490 saved
Exported 30% at 5p = £1,383 earned
Total a year About £16,873
Simple payback About 5.3 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

We found no council or regional grant for business solar open in Halifax at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Calderdale

At the end of 2025, Calderdale had 3,959 solar PV installations with 19.5 MW of capacity, up 88% since 2020, according to government figures. The Calderdale page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Halifax?

Northern Powergrid (Yorkshire). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Halifax?

About 92,200 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £16,873 a year. Your own roof, orientation and use will change this.

Can a business in Halifax get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for