Skip to content
CommercialSolarSurveys.com

Commercial solar installers in Pembroke Dock

Pembroke Dock is home to Pembroke Port (Pembroke Dock Marine), Cleddau Bridge Business Park (Llanion Hill) and Pembrokeshire Science and Technology Park. This page sets out the grid, planning and roof issues for a commercial solar project here, what a business roof could generate, and how to get a free site survey.

Key facts

Council area Pembrokeshire
Population 9,655 (Pembroke Dock built-up area, usual residents, Census 2021 (ONS, rounded to the nearest five))
Network operator National Grid Electricity Distribution (South Wales licence area)
Main employment areas Pembroke Port (Pembroke Dock Marine); Cleddau Bridge Business Park (Llanion Hill); Pembrokeshire Science and Technology Park
Enterprise or investment zone Celtic Freeport
Indicative yield About 1,064 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in Wales

Where businesses are in Pembroke Dock

  • Pembroke Port (Pembroke Dock Marine): The Port of Milford Haven's cargo and ferry port, where the £60 million Pembroke Dock Marine project has added open laydown and fabrication areas, a larger slipway, workboat berthing and heritage buildings converted into offices and workshops at the Gate 4 site.
  • Cleddau Bridge Business Park (Llanion Hill): A business park by the Cleddau Bridge where the Welsh Government is selling two level development plots, C2 and C3, totalling 5.35 acres for commercial uses, subject to planning.
  • Pembrokeshire Science and Technology Park: A site in Pembroke Dock, home to the Bridge Innovation Centre, where Pembrokeshire County Council lets small light industrial and office units.

Large employers and sectors with sites here include:

  • Marine energy and engineering: Pembroke Dock Marine, a £60 million Swansea Bay City Deal project led by the Port of Milford Haven with ORE Catapult, Marine Energy Wales and Celtic Sea Power, is expected to generate over 1,800 jobs.
  • Ferry services (Irish Ferries): Irish Ferries runs two crossings a day between Pembroke Dock and Rosslare on the Isle of Innisfree, taking just over four hours port to port.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Enterprise, investment and freeport zones

  • Celtic Freeport: Pembroke Dock is one of the Freeport's Milford Haven tax sites, designated with effect from 26 November 2024; Welsh Freeport tax reliefs are available until 30 September 2034.

These zones can bring business rates relief or enhanced capital allowances for eligible firms on qualifying sites; check the current terms with the zone before relying on them.

Grid connection

Pembroke Dock is served by National Grid Electricity Distribution (South Wales licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Pembroke Dock

Planning in Pembroke Dock is decided by Pembrokeshire council under the Welsh rules. Many non-domestic roofs are covered by Welsh permitted development, with conditions, but not within 3 km of an airport or aerodrome or on listed buildings.

Points that come up locally:

  • The Pembroke Dock Conservation Area, designated on 28 September 1994, covers about 144.3 hectares of the planned dockyard town, so many roofs in the town need more care.
  • In Wales, panels on a non-domestic building are usually permitted development if they project no more than 200mm from the roof or wall (1 metre above a flat roof), but in a conservation area panels on a front or side elevation wall visible from the road need planning consent, and a listed building needs planning permission and listed building consent.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Pembroke Dock could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,064 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 106,400 kWh a year
Used on site 70% at 24p = £17,875 saved
Exported 30% at 5p = £1,596 earned
Total a year About £19,471
Simple payback About 4.6 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Funding and support

  • Development Bank of Wales Green Business Loan Scheme: Discounted fixed interest rate loans for energy efficiency measures and low carbon projects, with renewables including solar PV listed as typical eligible projects. Limited companies, sole traders and partnerships must be based in Wales, have traded for at least two years and have at least one set of filed annual accounts. A grant of up to 50% of the cost of a detailed energy audit, to a maximum of £10,000 (£20,000 total costs), is also offered. Check the scheme's own page for eligibility and closing dates.

National reliefs apply too: see grants and reliefs in Wales.

Solar across Pembrokeshire

At the end of 2025, Pembrokeshire had 9,059 solar PV installations with 248.9 MW of capacity, up 23% since 2020, according to government figures. The Pembrokeshire page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Pembroke Dock?

National Grid Electricity Distribution (South Wales licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Pembroke Dock?

About 106,400 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £19,471 a year. Your own roof, orientation and use will change this.

Can a business in Pembroke Dock get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for