Key facts
| Council area | South Derbyshire |
| Population | 34,565 (Swadlincote built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5)) |
| Network operator | National Grid Electricity Distribution (East Midlands licence area) |
| Main employment areas | Tetron Point; Cadley Hill Industrial Estate; Woodville Regeneration Area |
| Indicative yield | About 966 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Swadlincote
- Tetron Point: A business park in Swadlincote that South Derbyshire District Council says has grown to take in numerous UK and international businesses.
- Cadley Hill Industrial Estate: An established estate on the west side of Swadlincote, next to Tetron Point and close to the A444 Burton Road.
- Woodville Regeneration Area: With the Woodville Regeneration Route complete, the council expects mixed use development on about 35 hectares of vacant and underused land here.
Large employers and sectors with sites here include:
- Steel reinforcement manufacturing (F. Brazil Reinforcements): One of the UK's leading manufacturers and suppliers of steel reinforcing products, with a site at Woodville.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Sector guides for Swadlincote sites
- Factories and workshops: with steel reinforcement manufacturing (F. Brazil Reinforcements) on the list above, see solar panels for factories for how factory roofs, daytime loads and payback work.
Grid connection
Swadlincote is served by National Grid Electricity Distribution (East Midlands licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Swadlincote
Swadlincote follows the national planning rules for England, decided by South Derbyshire council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- The Swadlincote Conservation Area covers about 16.4 hectares of the town centre and holds 8 Grade II listed buildings, among them a bottle kiln, so check whether a building is inside it before planning roof panels.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Swadlincote could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 966 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 96,600 kWh a year |
| Used on site | 70% at 24p = £16,229 saved |
| Exported | 30% at 5p = £1,449 earned |
| Total a year | About £17,678 |
| Simple payback | About 5.1 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Choosing a commercial solar installer in Swadlincote
Whichever commercial solar panel company, contractor or installer you talk to in Swadlincote, the checks that matter are the same:
- Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with National Grid Electricity Distribution.
- Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
- A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
- Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.
Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Swadlincote sites with.
Funding and support
We found no council or regional grant for business solar open in Swadlincote at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across South Derbyshire
At the end of 2025, South Derbyshire had 3,475 solar PV installations with 39.9 MW of capacity, up 31% since 2020, according to government figures. The South Derbyshire page has the full local figures and how they compare.
Nearby towns
- Ashby-de-la-Zouch, about 4 miles away
- Burton upon Trent, about 4 miles away
- Coalville, about 9 miles away
- Tamworth, about 11 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- southderbyshire.gov.uk: South Derbyshire Economic Development and Growth Strategy 2023
- southderbyshire.gov.uk: South Derbyshire Investment Prospectus 10 3 16 NEW
- southderbyshire.gov.uk: way to work swadlincote job fair
- heritagecheck.co.uk: swadlincote
- gov.uk: enterprise zones
- gov.uk: maps of east midlands freeport tax sites
- gov.uk: maps of east midlands investment zone tax sites
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Swadlincote?
National Grid Electricity Distribution (East Midlands licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Swadlincote?
About 96,600 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £17,678 a year. Your own roof, orientation and use will change this.
How do I choose a commercial solar installer in Swadlincote?
Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with National Grid Electricity Distribution), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.
Can a business in Swadlincote get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- South Derbyshire3,475 installations, 39.9 MW of solar and about 962 kWh per kWp a year for a south-facing roof.
- East MidlandsNGED connections, Golden Triangle logistics, Lincolnshire farming and food processing, Derby manufacturing and the Nottingham Workplace Parking Levy.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.