Key facts
| Council area | Somerset |
| Population | 12,105 (Wells built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5)) |
| Network operator | National Grid Electricity Distribution (South West licence area) |
| Main employment areas | Cathedral Park; Dulcote Quarry; Underwood Business Park |
| Indicative yield | About 1,006 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Wells
- Cathedral Park: A 17 acre business park on the south east edge of the city; the Mendip Local Plan lists Cathedral Park and the cold store site at 8.7 hectares, and Somerset Council's Wells Enterprise Centre opened there in December 2020.
- Dulcote Quarry: Land allocated for employment at the former Dulcote Quarry has been taken up by a food manufacturer; the Mendip Local Plan lists Bighams Foods at Dulcote Quarry at 10.1 hectares among the district's established employment sites.
- Underwood Business Park: A 3.3 hectare established employment site on the same Mendip Local Plan list.
Large employers and sectors with sites here include:
- The cathedral, tourism and services: Wells Cathedral and the city's medieval buildings provide much of the city's employment.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Grid connection
Wells is served by National Grid Electricity Distribution (South West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Wells
Wells follows the national planning rules for England, decided by Somerset council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Our planning permission guide sets out the rules.
What a business roof in Wells could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,006 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 100,600 kWh a year |
| Used on site | 70% at 24p = £16,901 saved |
| Exported | 30% at 5p = £1,509 earned |
| Total a year | About £18,410 |
| Simple payback | About 4.9 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Choosing a commercial solar installer in Wells
Whichever commercial solar panel company, contractor or installer you talk to in Wells, the checks that matter are the same:
- Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with National Grid Electricity Distribution.
- Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
- A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
- Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.
Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Wells sites with.
Funding and support
We found no council or regional grant for business solar open in Wells at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Somerset
At the end of 2025, Somerset had 28,561 solar PV installations with 566.2 MW of capacity, up 23% since 2020, according to government figures. The Somerset page has the full local figures and how they compare.
Nearby towns
- Shepton Mallet, about 4 miles away
- Midsomer Norton, about 9 miles away
- Frome, about 14 miles away
- Bridgwater, about 17 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- oxford-architects.com: cathedral park
- somerset.gov.uk: wells enterprise centre
- planvu.co.uk: cpt7.php
- planvu.co.uk: cpt10.php
- en.wikipedia.org: Wells, Somerset
- gov.uk: enterprise zones
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Wells?
National Grid Electricity Distribution (South West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Wells?
About 100,600 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,410 a year. Your own roof, orientation and use will change this.
How do I choose a commercial solar installer in Wells?
Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with National Grid Electricity Distribution), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.
Can a business in Wells get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Somerset28,561 installations, 566.2 MW of solar and about 1,036 kWh per kWp a year for a south-facing roof.
- South WestThe strongest yields in mainland Britain, a network with limited export capacity in places, Bristol and Bath clean air zones, dairy farming and Severnside logistics.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.