Skip to content
CommercialSolarSurveys.com

Commercial solar panel installers in Shepton Mallet

Looking for commercial solar panel installers in Shepton Mallet? We match businesses here with one MCS certified installer for a free site survey, on site or by video call. Shepton Mallet is home to Fosse Way Trading Estate, Crowne Trading Estate and Royal Bath and West Showground Enterprise Area.

Key facts

Council area Somerset
Population 9,645 (Shepton Mallet built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5))
Network operator National Grid Electricity Distribution (South West licence area)
Main employment areas Fosse Way Trading Estate; Crowne Trading Estate; Royal Bath and West Showground Enterprise Area; Kilver Street
Indicative yield About 1,015 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Shepton Mallet

  • Fosse Way Trading Estate: At 15.3 hectares, the largest of the town's established employment sites in the Mendip Local Plan; the plan also allocates 7.5 hectares of new employment land off Fosse Lane.
  • Crowne Trading Estate: An 11.2 hectare established employment site on the same Mendip Local Plan list.
  • Royal Bath and West Showground Enterprise Area: A 10 hectare enterprise area at the showground focused on agri-food businesses, with streamlined planning through a Local Development Order.
  • Kilver Street: A 7.8 hectare established employment site on the Mendip Local Plan list, at the eastern end of the town centre where cider is made.

Large employers and sectors with sites here include:

  • Cider making (Brothers Drinks): Brothers Drinks, home to Babycham, Mallets and Brothers Cider, runs the Shepton Mallet cider mill and has installed a 317 kW, 772 panel solar system there that supplies the presses directly and was expected to pay for itself in under three years.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Grid connection

Shepton Mallet is served by National Grid Electricity Distribution (South West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Shepton Mallet

Shepton Mallet follows the national planning rules for England, decided by Somerset council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Shepton Mallet Conservation Area, designated in 1973, covers about 85.9 hectares and holds 191 listed buildings, one of them Grade I, so roofs in the centre and along the valley need more care.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Shepton Mallet could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,015 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 101,500 kWh a year
Used on site 70% at 24p = £17,052 saved
Exported 30% at 5p = £1,523 earned
Total a year About £18,575
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Choosing a commercial solar installer in Shepton Mallet

Whichever commercial solar panel company, contractor or installer you talk to in Shepton Mallet, the checks that matter are the same:

  • Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with National Grid Electricity Distribution.
  • Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
  • A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
  • Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.

Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Shepton Mallet sites with.

Funding and support

We found no council or regional grant for business solar open in Shepton Mallet at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Somerset

At the end of 2025, Somerset had 28,561 solar PV installations with 566.2 MW of capacity, up 23% since 2020, according to government figures. The Somerset page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Shepton Mallet?

National Grid Electricity Distribution (South West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Shepton Mallet?

About 101,500 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,575 a year. Your own roof, orientation and use will change this.

How do I choose a commercial solar installer in Shepton Mallet?

Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with National Grid Electricity Distribution), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.

Can a business in Shepton Mallet get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for