Key facts
| Council area | Bath and North East Somerset |
| Population | 13,745 (Midsomer Norton built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5)) |
| Network operator | National Grid Electricity Distribution (South West licence area) |
| Main employment areas | Midsomer Enterprise Park; Westfield industrial estates |
| Enterprise or investment zone | Somer Valley Enterprise Zone (part of the Bristol Temple Quarter and Bath, North East Somerset Valley Enterprise Zone) |
| Indicative yield | About 1,017 kWh per kWp a year (south facing, 30 degrees) |
| Nation support page | Grants and reliefs in England |
Where businesses are in Midsomer Norton
- Midsomer Enterprise Park: One of the core business and industrial estates named in Bath and North East Somerset's Placemaking Plan for the Somer Valley, with land to its west identified for further development.
- Westfield industrial estates: Named in the same plan among the Somer Valley's main industrial and business estates.
Large employers and sectors with sites here include:
- Printing and packaging: After coal mining ended the town became a centre for printing and packaging, with firms expanding onto local trading estates, although several large plants have since closed.
Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.
Enterprise, investment and freeport zones
- Somer Valley Enterprise Zone (part of the Bristol Temple Quarter and Bath, North East Somerset Valley Enterprise Zone): A 13.5 hectare greenfield site at Old Mills on the north western edge of the town, established in April 2017 to support local businesses and attract new ones; check with Bath and North East Somerset Council what has been built and which reliefs apply.
These zones can bring business rates relief or enhanced capital allowances for eligible firms on qualifying sites; check the current terms with the zone before relying on them.
Grid connection
Midsomer Norton is served by National Grid Electricity Distribution (South West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.
Planning in Midsomer Norton
Midsomer Norton follows the national planning rules for England, decided by Bath and North East Somerset council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.
Points that come up locally:
- The Midsomer Norton and Welton Conservation Area covers about 69 hectares and holds 36 listed buildings, so check whether a building is inside it before planning roof panels.
Our guides on listed buildings and conservation areas explain what these mean for a solar project.
What a business roof in Midsomer Norton could generate
Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,017 kWh per kWp a year.
| Item | Illustrative figure |
|---|---|
| System | 100 kWp, south facing at 30 degrees |
| Installed cost | £900 per kWp, so £90,000 excluding VAT |
| Generation | About 101,700 kWh a year |
| Used on site | 70% at 24p = £17,086 saved |
| Exported | 30% at 5p = £1,526 earned |
| Total a year | About £18,611 |
| Simple payback | About 4.8 years before tax relief |
Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.
Choosing a commercial solar installer in Midsomer Norton
Whichever commercial solar panel company, contractor or installer you talk to in Midsomer Norton, the checks that matter are the same:
- Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with National Grid Electricity Distribution.
- Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
- A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
- Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.
Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Midsomer Norton sites with.
Funding and support
We found no council or regional grant for business solar open in Midsomer Norton at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.
Solar across Bath and North East Somerset
At the end of 2025, Bath and North East Somerset had 6,011 solar PV installations with 56.8 MW of capacity, up 202% since 2020, according to government figures. The Bath and North East Somerset page has the full local figures and how they compare.
Nearby towns
- Shepton Mallet, about 7 miles away
- Frome, about 8 miles away
- Wells, about 9 miles away
- Trowbridge, about 12 miles away
Sources
- ons.gov.uk: census2021
- ons.gov.uk: datadownload.xlsx
- bathnes.gov.uk: cs pmp vol 4 somer valley
- en.wikipedia.org: Midsomer Norton
- bathnes.gov.uk: introduction
- gov.uk: enterprise zones
- heritagecheck.co.uk: midsomer norton and welton
- Yield: PVGIS 5.3 (European Commission Joint Research Centre), SARAH3 data, 14% system losses, for the town centre, modelled 4 November 2026.
- Council area figures: DESNZ, renewable electricity by local authority 2014 to 2025.
Frequently asked questions
Who is the electricity network operator in Midsomer Norton?
National Grid Electricity Distribution (South West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.
How much would a 100 kWp solar system generate in Midsomer Norton?
About 101,700 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,611 a year. Your own roof, orientation and use will change this.
How do I choose a commercial solar installer in Midsomer Norton?
Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with National Grid Electricity Distribution), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.
Can a business in Midsomer Norton get a free solar survey?
Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.
Related pages
- Bath and North East Somerset6,011 installations, 56.8 MW of solar and about 1,022 kWh per kWp a year for a south-facing roof.
- South WestThe strongest yields in mainland Britain, a network with limited export capacity in places, Bristol and Bath clean air zones, dairy farming and Severnside logistics.
- Commercial solar calculatorEstimate commercial solar savings and payback, with the generation, price and cost assumptions shown and sourced, and the limits of a simple estimate explained.
- EnglandCurrent solar support in England for businesses, schools, public bodies, community groups and farms, plus rates, planning and who to contact.
- Planning permissionPermitted development for commercial rooftop solar and car park canopies in England, prior approval, heritage limits, ground-mounted schemes and the other UK nations.