Skip to content
CommercialSolarSurveys.com

Commercial solar panel installers in Midsomer Norton

Looking for commercial solar panel installers in Midsomer Norton? We match businesses here with one MCS certified installer for a free site survey, on site or by video call. Midsomer Norton is home to Midsomer Enterprise Park and Westfield industrial estates.

Key facts

Council area Bath and North East Somerset
Population 13,745 (Midsomer Norton built-up area, usual residents, Census 2021 (ONS, rounded to the nearest 5))
Network operator National Grid Electricity Distribution (South West licence area)
Main employment areas Midsomer Enterprise Park; Westfield industrial estates
Enterprise or investment zone Somer Valley Enterprise Zone (part of the Bristol Temple Quarter and Bath, North East Somerset Valley Enterprise Zone)
Indicative yield About 1,017 kWh per kWp a year (south facing, 30 degrees)
Nation support page Grants and reliefs in England

Where businesses are in Midsomer Norton

  • Midsomer Enterprise Park: One of the core business and industrial estates named in Bath and North East Somerset's Placemaking Plan for the Somer Valley, with land to its west identified for further development.
  • Westfield industrial estates: Named in the same plan among the Somer Valley's main industrial and business estates.

Large employers and sectors with sites here include:

  • Printing and packaging: After coal mining ended the town became a centre for printing and packaging, with firms expanding onto local trading estates, although several large plants have since closed.

Large, simple roofs on distribution sheds and modern industrial units are usually the quickest and cheapest to fit. Older mill, factory and workshop buildings can work well too, but often need a structural survey first, and roofs from before 2000 may contain asbestos cement: see asbestos roofs.

Enterprise, investment and freeport zones

  • Somer Valley Enterprise Zone (part of the Bristol Temple Quarter and Bath, North East Somerset Valley Enterprise Zone): A 13.5 hectare greenfield site at Old Mills on the north western edge of the town, established in April 2017 to support local businesses and attract new ones; check with Bath and North East Somerset Council what has been built and which reliefs apply.

These zones can bring business rates relief or enhanced capital allowances for eligible firms on qualifying sites; check the current terms with the zone before relying on them.

Grid connection

Midsomer Norton is served by National Grid Electricity Distribution (South West licence area). Almost every commercial system needs G99 approval from the network operator before it is switched on, and the question is usually how much the local network can take back. Where export is limited, a G100 export limitation scheme can let a larger array connect. See G99 and DNO applications.

Planning in Midsomer Norton

Midsomer Norton follows the national planning rules for England, decided by Bath and North East Somerset council. Rooftop solar on most non-domestic buildings is permitted development, within height and edge limits, and systems above 50 kW need a prior approval application covering design and glare.

Points that come up locally:

  • The Midsomer Norton and Welton Conservation Area covers about 69 hectares and holds 36 listed buildings, so check whether a building is inside it before planning roof panels.

Our guides on listed buildings and conservation areas explain what these mean for a solar project.

What a business roof in Midsomer Norton could generate

Modelled with PVGIS for the town centre, a south-facing roof at 30 degrees produces about 1,017 kWh per kWp a year.

Item Illustrative figure
System 100 kWp, south facing at 30 degrees
Installed cost £900 per kWp, so £90,000 excluding VAT
Generation About 101,700 kWh a year
Used on site 70% at 24p = £17,086 saved
Exported 30% at 5p = £1,526 earned
Total a year About £18,611
Simple payback About 4.8 years before tax relief

Illustrative, not a quote: the same sums as our commercial solar calculator. A company paying corporation tax can usually shorten the payback with capital allowances.

Choosing a commercial solar installer in Midsomer Norton

Whichever commercial solar panel company, contractor or installer you talk to in Midsomer Norton, the checks that matter are the same:

  • Certification for the size of system. MCS covers solar PV systems up to 50 kWp. Above 50 kW there is no single certificate, so ask for references on systems of a similar size, a named designer and experience of G99 applications with National Grid Electricity Distribution.
  • Insurance. Ask for current public liability and employers' liability certificates, not just a line in the quote.
  • A design based on your site. The quote should be built on your own half-hourly or bill data and a surveyed roof, and say what generation per kWp it assumes.
  • Maintenance after switch-on. Monitoring that someone actually watches, regular inspections and periodic electrical testing keep a system earning: see our maintenance guide.

Our guide to choosing a commercial solar installer shows how to compare quotes line by line, and how we check installers explains who we match Midsomer Norton sites with.

Funding and support

We found no council or regional grant for business solar open in Midsomer Norton at the time of writing (November 2026). National reliefs still apply, such as capital allowances and, in England, the business rates exemption for onsite renewables: see grants and reliefs in England.

Solar across Bath and North East Somerset

At the end of 2025, Bath and North East Somerset had 6,011 solar PV installations with 56.8 MW of capacity, up 202% since 2020, according to government figures. The Bath and North East Somerset page has the full local figures and how they compare.

Nearby towns

Sources

Frequently asked questions

Who is the electricity network operator in Midsomer Norton?

National Grid Electricity Distribution (South West licence area). Most commercial solar systems need its G99 approval before they are switched on. The operator follows the postcode, so confirm yours with the Energy Networks Association postcode tool.

How much would a 100 kWp solar system generate in Midsomer Norton?

About 101,700 kWh a year for a south-facing roof at 30 degrees, modelled with PVGIS for the town centre. At 70% used on site at 24p and the rest exported at 5p, that is worth about £18,611 a year. Your own roof, orientation and use will change this.

How do I choose a commercial solar installer in Midsomer Norton?

Check certification for the size of system (MCS covers systems up to 50 kWp; above that, ask for references on similar sized jobs and G99 experience with National Grid Electricity Distribution), current insurance certificates, a design based on your own energy data and a plan for maintenance. Our guide to choosing an installer covers comparing quotes.

Can a business in Midsomer Norton get a free solar survey?

Yes. Answer six short questions and we match the site with one MCS certified installer, who surveys it on site or by video call. It is free, with no obligation. Get a free survey.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for