Carbon reduction plans and PPN 006

Suppliers bidding for central government contracts worth more than £5 million a year must provide a carbon reduction plan: a published commitment to net zero by 2050, with current scope 1, scope 2 and some scope 3 emissions and the measures being taken. PPN 006 replaced PPN 06/21 for procurements from 24 February 2025. On-site solar is a measure that directly cuts your scope 2 figure. Checked on GOV.UK on 2 November 2026.

Updated 3 minute read

What a carbon reduction plan is

PPN 006 says in-scope organisations should require bidding suppliers, as a condition of participation, to provide a carbon reduction plan using the government template (PPN 006). The plan:

  • Commits to net zero: The supplier's commitment to net zero by 2050 for its UK operations
  • Reports emissions: Current emissions for scope 1 and 2 and a defined subset of scope 3
  • Lists measures: Environmental management measures in effect, including certification schemes or specific carbon reduction measures
  • Is public: Published on the supplier's website

Who needs one: public contracts

When PPN 006 applies, from the Cabinet Office (checked 2 November 2026)

Rule
Buyers it applies to Central government departments, their executive agencies and non-departmental public bodies
Contract value Above £5 million a year, including VAT
Frameworks and dynamic markets Where an individual contract is expected to exceed £5 million a year
From Procurements advertised on or after 24 February 2025, under the Procurement Act 2023
Earlier procurements PPN 06/21 still applies

The Cabinet Office says the update to PPN 006 "does not constitute a change in policy or a new call for action" (PPN 006, GOV.UK, PPN 06/21).

What goes in it

  • Baseline and current emissions: Scope 1, scope 2 and the scope 3 categories listed in the technical standard, such as upstream and downstream transport, waste, business travel and employee commuting
  • Greenhouse gases: The seven named by the Kyoto Protocol
  • Reduction measures: What you have done and will do
  • Annual review: Plans should be reviewed and updated annually
  • Sign-off: Board approval stated with its date, and signed off by a director (or a designated member for an LLP) with name, title and date

Source: PPN 006 technical standard. The template is published with the PPN.

Solar as a reduction measure

Scope 2 is the emissions from the electricity, heat, steam and cooling you buy. Solar panels on your own premises reduce the electricity you buy, so they reduce your scope 2 figure year after year, and they are a specific, measurable measure to put in the plan.

  • Measurable: Generation is metered, so the reduction is evidenced, not estimated
  • Lasting: Panels keep reducing purchased electricity for their working life
  • Within your control: Unlike grid decarbonisation, it is an action you take
  • No upfront cost option: A rooftop PPA still cuts what you buy from the grid

See SECR and scope 2 emissions, solar PPAs and renewable energy for business.

Note: General information from Cabinet Office guidance, not procurement advice.

Sources

The Cabinet Office PPN 006 page, the PPN itself and its technical standard were read on 2 November 2026.

Frequently asked questions

What is a carbon reduction plan?

A document a supplier publishes to win larger central government contracts. Under PPN 006 it confirms the supplier's commitment to net zero by 2050 for its UK operations, gives its current scope 1 and scope 2 emissions and a defined subset of scope 3, and sets out the carbon reduction measures it has adopted. It must be published on the supplier's website.

Is PPN 06/21 still in force?

For procurements commenced before 24 February 2025, yes. For procurements under the Procurement Act 2023 from that date, the Cabinet Office replaced it with PPN 006, which it says reflects the new terminology and does not change the policy.

Which contracts need a carbon reduction plan?

PPN 006 applies to central government departments, their executive agencies and non-departmental public bodies, for contracts with an estimated value above £5 million a year including VAT. It also applies to frameworks and dynamic markets where an individual contract is expected to exceed that. Other public bodies may choose to ask for one.

Who has to sign off a carbon reduction plan?

The technical standard says the plan should state that the board of directors (or equivalent) has approved it, with the date, and must be signed off by a director or equivalent, with their name, job title and date. It should be reviewed and updated annually.

Can solar panels go in a carbon reduction plan?

Yes, as a carbon reduction measure. Electricity generated and used on site reduces the electricity you buy, which is your scope 2 emissions, one of the figures the plan reports. PPN 006 asks for the measures in effect, and those you will be able to apply when performing the contract.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

Step 1 of 7
Question 1 of 6: What kind of site is it?
Question 2 of 6: Do you own the building, or is it leased?
Question 3 of 6: Roughly what do you spend on electricity a month?
Question 4 of 6: Is this your first time looking into solar?
Question 5 of 6: When are you hoping to go ahead?
Question 6 of 6: What kind of survey would you like?
Where is the site, and who should we ask for?

Free site survey, no obligation. Your details go to one matched installer only.

See what you qualify for