Skip to content
CommercialSolarSurveys.com

MEES regulations and commercial EPC ratings

The Minimum Energy Efficiency Standard means a privately rented commercial property in England and Wales needs an EPC of at least E, unless an exemption is registered. In June 2026 the government proposed raising that to B from 2031, where cost-effective, for buildings over 1,000 square metres, and dropped the planned C by 2027. Solar is one of the measures an assessor can model for a building. Checked on GOV.UK on 2 November 2026.

Updated 4 minute read

What MEES requires of commercial landlords

GOV.UK says: "Since 1 April 2018, landlords of non-domestic rented properties have only been permitted to grant a new tenancy, or to extend or renew an existing tenancy, if their property has at least an Energy Performance Certificate (EPC) E rating, unless they have registered a valid exemption." From 1 April 2023 the requirement applies to all privately rented non-domestic properties, even where the tenancy has not changed (GOV.UK landlord guidance).

  • Who it covers: Non-domestic rented property legally required to have an EPC, let for a term certain between 6 months and 99 years
  • Who it doesn't: Terms of 6 months or less (with exceptions) and of 99 years or more, and property not required to have an EPC
  • Empty property: No action is needed until you decide to let it again
  • Enforcement: The enforcement authority can serve a compliance notice, and a confirmed breach can bring a financial penalty

You can look up a building's current certificate on the government register (find an energy certificate).

Current and proposed EPC thresholds

Commercial MEES thresholds in England and Wales, checked 2 November 2026

When Standard Status
Since 1 April 2018 EPC E to grant, extend or renew a tenancy In force
Since 1 April 2023 EPC E for all privately rented non-domestic property In force
2027 Interim EPC C milestone Will not be taken forward (June 2026)
From 2031 EPC B, where cost-effective, for buildings over 1,000 square metres Proposed (June 2026 interim response)
Below 1,000 square metres Stays at EPC E, no set date to go further Proposed (June 2026 interim response)

The interim response says existing flexibility, including the 7 year payback test and the exemptions, will remain, "ensuring that only improvements that are practical, affordable and cost-effective will be required" (GOV.UK interim response). It follows consultations in 2019 and 2021; the 2020 Energy White Paper had set EPC B by 2030 as the target (consultation page). The changes still need legislation, so watch for the full response.

Can solar improve a commercial EPC?

A commercial EPC grades a building from A to G and is produced by an accredited commercial energy assessor; it is valid for 10 years (GOV.UK). Rooftop solar becomes part of the building's own energy supply, so it is one of the measures worth testing on the way to E now or B later, alongside lighting, heating, controls and insulation. We don't promise it lifts a rating: that is the assessor's calculation.

How far a given array moves the rating, if at all, depends on the building, its other services and the size of the system. So the order that works is:

  • Get the current EPC and its recommendations: They show where the rating is lost
  • Ask an accredited assessor to model the options: Including solar of the size your roof can take, before you commit
  • Get a solar survey: So the assessor models a real design, and you know what it does to the tenant's bills too
  • Check the 7 year payback test: A measure that fails it can be registered as an exemption instead

Exemptions

An exemption must be registered on the PRS Exemptions Register before it can be relied on, and most last 5 years (GOV.UK). The ones a landlord considering solar is most likely to meet:

  • 7 year payback: A measure fails where the expected bill savings over 7 years are less than its cost; lasts 5 years
  • All improvements made: Every relevant cost-effective improvement is done and the property is still below E; lasts 5 years
  • Third-party consent: An improvement needs consent from a tenant, superior landlord, mortgagee, freeholder or the planning department, and it can't be obtained
  • Property devaluation: Lasts 5 years
  • New landlord: A temporary 6-month exemption in certain circumstances

An exemption does not pass to a new owner when the property is sold.

Solar and your tenants

On a let building, the landlord usually owns the roof and the tenant pays the electricity bill. That split decides who pays for solar and who benefits: the landlord can fund it and sell the power to the tenant, the tenant can install with consent, or a third party can fund it under a PPA. Our guide to solar on leased property goes through green lease clauses and who owns the panels. For the wider picture on renewables for an occupier, see renewable energy for business.

Note: General information from GOV.UK, not legal advice. An accredited energy assessor rates the building, and your solicitor advises on leases.

Sources

The GOV.UK landlord guidance and the 18 June 2026 interim response were read on 2 November 2026. The proposed 2031 standard is not yet law; check GOV.UK for the full response.

Frequently asked questions

What are the MEES regulations for commercial property?

The Minimum Energy Efficiency Standard for privately rented non-domestic property in England and Wales. Since 1 April 2018 a landlord has only been able to grant, extend or renew a tenancy if the property has an EPC of at least E, unless a valid exemption is registered. Since 1 April 2023 that applies to all privately rented non-domestic property, even with no change of tenancy.

Is the commercial EPC minimum going up to B?

Proposed, for larger buildings. In its interim response of 18 June 2026 the government said that from 2031 it proposes privately rented buildings over 1,000 square metres in England and Wales must reach EPC B where cost-effective, that buildings below 1,000 square metres stay at E, and that the interim EPC C milestone for 2027 will not go ahead. The detail is still to be legislated.

Can solar panels improve a commercial EPC rating?

They may. Rooftop solar becomes part of the building's own energy supply, and a commercial EPC is produced by an accredited non-domestic energy assessor. How much a particular array moves the rating, if at all, depends on the building and its other services, so ask the assessor to model it before you rely on solar to reach a band.

What is the 7 year payback exemption?

If a recommended improvement would not pay for itself within 7 years through the expected savings on energy bills, the landlord can register it as not cost-effective. GOV.UK says this and most other exemptions last 5 years, after which the landlord must try again to improve the rating.

Does MEES apply to every commercial lease?

No. GOV.UK says it applies to non-domestic rented property legally required to have an EPC, let on a tenancy for a term certain between 6 months and 99 years. Shorter and longer terms are outside it, as are properties not required to have an EPC.

What if the tenant won't agree to solar on the roof?

There is a third-party consent exemption where an improvement needs consent from a tenant, superior landlord, mortgagee, freeholder or the planning authority and, despite reasonable efforts, it can't be obtained. It has to be registered on the PRS Exemptions Register before it can be relied on.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

Step 1 of 7
Question 1 of 6: What kind of site is it?
Question 2 of 6: Do you own the building, or is it leased?
Question 3 of 6: Roughly what do you spend on electricity a month?
Question 4 of 6: Is this your first time looking into solar?
Question 5 of 6: When are you hoping to go ahead?
Question 6 of 6: What kind of survey would you like?
Where is the site, and who should we ask for?

Free site survey, no obligation. Your details go to one matched installer only.

See what you qualify for