What power factor is, in plain terms
Electric motors, transformers, compressors and older fluorescent lighting need two kinds of power. Active power (kW) does the work. Reactive power (kVAr) builds the magnetic fields the equipment needs and flows back and forth without doing work. Together they make the apparent power (kVA) the network has to carry. Power factor is kW divided by kVA: 1.0 means all the current does work, 0.85 means the network carries about 18% more current than the work needs.
National Grid Electricity Distribution (NGED), the network operator for the Midlands, South West and South Wales, puts it this way in its charging statement: power flowing below 0.95 "results in much higher losses in the Distribution System, a need to potentially provide higher capacity electrical equipment and consequently a higher bill for you the consumer", and reactive power charges "are generally avoidable" with good design that keeps the power factor "between 0.95 and unity at the Metering Point" (NGED charging statement).
When you pay for it: reactive power and capacity charges
Reactive power is charged only on half-hourly metered connections. Under NGED's statement, when a half-hourly site's reactive power "exceeds 33% of its total active power (measured in kWh) in any given half hour, excess reactive power charges will apply. This threshold is equivalent to an average power factor of 0.95 during that half hour." Only the kVArh above that 33% is charged, worked out half hour by half hour and added up over the billing period. The same statement charges capacity on the Maximum Import Capacity (MIC) you have agreed, in kVA, and adds an excess capacity charge for the whole billing period if the site goes over it. Because kVA includes reactive power, a poor power factor uses up capacity.
NGED South West, charges from 1 April 2026, site-specific (half-hourly) tariffs, band 1
| Low voltage (LV) site | High voltage (HV) site | |
|---|---|---|
| Excess reactive power charge | 0.216p per kVArh | 0.082p per kVArh |
| Capacity charge | 12.18p per kVA per day | 10.06p per kVA per day |
| Exceeded capacity charge | 12.18p per kVA per day | 10.06p per kVA per day |
| Red band unit charge (weekdays 17:00 to 19:00) | 14.833p per kWh | 7.242p per kWh |
Source: NGED (South West) use of system charging statement, Annex 1. Each of the 14 distribution areas publishes its own rates every year, so look up your own operator's statement, or ask your supplier for the network charges on your contract; on a half-hourly bill they are often shown as separate lines.
Three rules from the statement are worth knowing before anyone sells you equipment:
- A smaller MIC is your request, not automatic. The capacity charge is on the MIC you agreed, whatever you use. It can be reduced only once in 12 months, and capacity you give up "may not be available in the future without the need for network reinforcement and associated charges".
- Going over costs a whole period. Exceeded capacity is charged "for the full duration of the billing period in which the breach occurs".
- Non-half-hourly sites pay no reactive charge. If your bill has no reactive power or kVArh line, correction will not save you a reactive charge.
Worked example: what poor power factor costs a manufacturer
Take the illustrative manufacturer used across this site: 300,000 kWh of electricity a year, on an LV half-hourly supply, at the NGED South West rates above. Assume, for illustration, that its power factor sits at 0.85 in every half hour, its peak demand is 120 kW, and it has booked an MIC of 150 kVA.
| Power factor 0.85 | After correction to 0.98 | |
|---|---|---|
| Reactive energy | About 185,900 kVArh a year | Under the 33% threshold |
| Chargeable kVArh | About 86,900 a year | None |
| Excess reactive power charge at 0.216p | About £188 a year | £0 |
| Peak apparent power (120 kW ÷ power factor) | 141 kVA | 122 kVA |
| MIC needed | 150 kVA booked | Could be cut to 130 kVA |
| Capacity charge at 12.18p per kVA per day | £6,669 a year | £5,779 a year |
How it is worked out: at 0.85, reactive energy is about 0.62 kVArh for every kWh, so 300,000 kWh brings about 185,900 kVArh. The free allowance is 0.33 kVArh per kWh, 99,000 kVArh, leaving about 86,900 chargeable, × 0.216p = about £188. Capacity: 150 kVA × 12.18p × 365 = £6,669; 130 kVA × 12.18p × 365 = £5,779, a difference of about £889 a year if the MIC is reduced. A real bill will differ, because power factor changes through the day with what is running.
What the example shows: on these rates the reactive charge itself is small, and most of the money is in capacity, and only if you go on to reduce your MIC. Together about £1,077 a year in this example, against about £18,180 a year from the 100 kWp solar system in our payback guide. Correction also lowers the current in your own cables, so losses on your side of the meter fall a little, but the kWh your equipment uses does not change. Ask any supplier to show the saving from your own half-hourly data, line by line.
What rooftop solar does to power factor
Most solar inverters supply active power only, at or close to unity power factor. On a sunny afternoon they cover part of your kW, but your motors still draw the same reactive power from the grid. So the power factor at the meter falls while the panels are generating.
Take one half hour at the same site: 50 kWh and 31 kVArh drawn from the grid is a power factor of 0.85. If solar supplies 30 kWh of that, the grid supplies 20 kWh and still 31 kVArh, and the power factor at the meter falls to about 0.54. Over a year, if the site's reactive demand stays the same while solar cuts grid imports to 228,000 kWh, the free allowance shrinks to about 75,200 kVArh and the reactive charge rises by about £51 a year at 0.216p. That is far smaller than the solar saving, but it shows up on the bill, and it is the kind of change that sometimes leads to a bill query after an installation.
What to do about it:
- Ask for reactive power in the design. Many commercial inverters can be set to supply reactive power or run at a set power factor, within your connection agreement; settings and any export limits need agreeing with the network operator through the G99 application.
- Check existing correction equipment. Some capacitor banks are fixed; automatic banks switch steps in and out as the load changes, which copes better with solar.
- Keep the numbers apart. Your capacity (kVA) need is set by your peak, which on many sites is a winter weekday when solar adds little, so do not expect solar alone to let you cut your MIC. A battery can trim that peak and the red band units.
How to check if power factor correction would pay
- Look at your bill. Find the reactive power (kVArh) line, the capacity charge and your agreed MIC. No reactive line means no reactive charge to save.
- Get 12 months of half-hourly data with reactive power (kVArh), not just kWh. Your supplier or meter operator can provide it; our page on energy data analysis explains how it is used.
- Have a qualified electrician measure the site before buying, including harmonics, which some capacitor banks are not designed for.
- Do the cheap measures too. Motors on variable speed drives and LED lighting change both energy use and power factor; see voltage optimisation and cutting business energy costs.
A free site survey models solar from your own half-hourly data, and can flag where your power factor and capacity need to be part of the design.
Note: General information, not advice. Network charges are set by each distribution network operator under Ofgem-approved methodologies and change every April. Power factor correction must be designed and installed by a qualified electrician.
Sources
Read on 25 November 2026.
Frequently asked questions
What is power factor correction?
Power factor correction is equipment, usually a bank of capacitors, that supplies the reactive power motors, transformers and older lighting need, so less of it is drawn from the grid. It brings the power factor at your meter closer to 1. That can remove excess reactive power charges and lower the kVA capacity your site needs.
What power factor do I need to avoid reactive power charges?
On distribution network charges, 0.95 or better in each half hour. National Grid Electricity Distribution's charging statement applies excess reactive power charges when reactive power exceeds 33% of active power in a half hour, which it says is equivalent to an average power factor of 0.95. Only half-hourly metered sites pay them.
How much does a poor power factor cost?
It depends on your network area and your site. At National Grid Electricity Distribution South West's 2026 rates, a 300,000 kWh low voltage site at 0.85 pays about £188 a year in excess reactive power charges. The bigger cost is often capacity: correcting to 0.98 could let it book 20 kVA less, about £889 a year less.
Do solar panels affect power factor?
They can lower it at the meter. Most inverters supply only active power, so when the panels are generating the grid supplies fewer kW but the same reactive power, and the measured power factor falls. Many commercial inverters can be set to supply reactive power, which the installer agrees with the network operator.
Will power factor correction reduce my kWh?
Barely. The kWh your equipment uses does not change; correction lowers the current, which trims cable losses on your side of the meter. The savings come from the reactive power charge and, if you reduce your agreed capacity, the capacity charge. Ask for the saving to be shown from your own bill and half-hourly data.
Related pages
- Voltage optimisationHow voltage optimisation works, which equipment saves and which does not, what it costs, how to measure the result, and a worked comparison with rooftop solar.
- Demand side responseDemand side response for business owners: the Demand Flexibility Service, DUoS time bands, TNUoS Triads and fixed residual charges, and what solar and batteries can and cannot do.
- Energy data analysisHow half-hourly consumption data shapes solar sizing and payback: getting the data, profile classes, baseload, weekend and seasonal use, self-consumption and batteries.
Battery storageWhen a commercial battery pays: storing surplus solar, time of use tariffs, peak shaving, sizing from half-hourly data, illustrative costs, safety and siting.- G99 and DNO applicationsG98 versus G99, what goes into a DNO application, connection offers, export limitation under G100, reinforcement costs and how the survey checks your supply.
- Business electricity pricesPublished DESNZ figures show what businesses pay per kWh by size of user; your own unit rate is what solar replaces.