Climate Change Agreements: who can join the 2026 scheme, what it saves, and where solar fits

A Climate Change Agreement (CCA) is a voluntary deal with the Environment Agency: an energy intensive site agrees energy or carbon targets through its sector association and, in return, pays 92% less Climate Change Levy on electricity and 89% less on gas. The new scheme began on 1 January 2026, sets targets to the end of 2030 and gives the discount until 31 March 2033. New sites in eligible sectors apply between 1 January and 31 August each year to 2029, so the next window opens on 1 January 2027. Under the new rules, electricity from your own solar panels counts as zero carbon. Checked on 27 November 2026.

Updated 7 minute read

What a Climate Change Agreement is

The Climate Change Levy is a tax on the energy a business buys, charged by your supplier. A CCA is the way energy intensive industry pays far less of it. GOV.UK describes CCAs as "voluntary agreements made between UK industry and the Environment Agency" to reduce energy use and CO2 emissions, in return for "a discount on the Climate Change Levy" (GOV.UK). The Environment Agency administers the scheme for the whole of the UK.

There are two layers:

  • An umbrella agreement between a sector association and the Environment Agency, which sets the sector's targets and the processes that are eligible.
  • An underlying agreement held by the operator for a site or a group of sites, with targets taken from the umbrella agreement.

You do not apply to the government directly. GOV.UK says an operator that wants a CCA "must apply first to its sector association" (GOV.UK).

What it saves on the levy

Climate Change Levy main rates and the CCA discount, from HMRC

From 1 April 2026 From 1 April 2027 CCA discount
Electricity (£ per kWh) 0.00801 0.00827 92%
Gas (£ per kWh) 0.00801 0.00827 89%

Source: HMRC, Climate Change Levy rates. A CCA site pays 8% of the main electricity rate and 11% of the main gas rate. The government estimated in October 2024 that the new scheme is worth about £1.9 billion of reduced levy over its six years (government response).

Example: The levy on the site's shared 300,000 kWh user (illustrative)

At the main rate from April 2026: 300,000 kWh × £0.00801 = £2,403 a year

With a CCA, 8% of that: about £192 a year

The same sums for gas: a site burning 400,000 kWh of gas would pay about £3,204 at the main rate, and about £352 with the 89% discount.

Illustrative only. Your supplier applies the reduced rate once your facility is on the reduced rate certificate.

The 2026 scheme: the dates that matter

Dates
Target Period 7 1 January 2026 to 31 December 2026
Target Period 8 1 January 2027 to 31 December 2028
Target Period 9 1 January 2029 to 31 December 2030
Reduced levy rates Until 31 March 2033 for sites meeting their obligations
New entrants in eligible sectors Apply between 1 January and 31 August, each year from 2026 to 2029
Last date a facility can be added Before 1 January 2030
Performance reports By 1 May in the year after each target period ends

Sources: CCA statutory guidance 2026 and the October 2024 government response. The response calls these the first three target periods of the new scheme; the 2026 statutory guidance numbers them 7, 8 and 9, carrying on from the old scheme. The 31 August deadline gives the Environment Agency time to issue agreements before the next calendar year, and new entrants get the discount from the point they enter, with no minimum period of performance data first.

Who can join

Three tests, from the sector down to the meter:

Test What it means
Your sector or process is eligible It is covered by an umbrella agreement. For a new sector to get in, its energy costs must be at least 10% of its production value, or 3% to 10% with an import penetration ratio of at least 50%
Your site is an eligible facility The facility falls within paragraph 50 of Schedule 6 to the Finance Act 2000, and its activities fall within the umbrella agreement
The 70% rule At least 70% of the reckonable energy supplied to the facility is intended to be used in the eligible installation. Other activities can be included if they use no more than 3/7 of the installation's energy

Sources: CCA statutory guidance 2026 and the government response. GOV.UK says the sectors range from energy intensive chemicals and paper to supermarkets and intensive pig and poultry farming (GOV.UK); your sector association confirms whether your processes qualify.

Three new processes from 2027. The government published amending regulations on 20 April 2026 adding the mechanical recycling of plastic, the packaging of spirits and the production of automotive grade battery cells, anticipated to come into force on 1 January 2027, subject to approval by the House of Commons (GOV.UK). If you run a distillery that bottles its own spirits, ask your trade association whether you will be covered.

Targets, surplus and buy-out

  • One target type. The new scheme uses a single unified target type adapted from the Novem method, with targets for 2026 to 2030 built on a 2022 base year and each sector's commitment (government response, statutory guidance).
  • Facility level reporting, with a light annual report at the end of year one of each two-year target period.
  • Surplus from beating a target can be carried to the next target period within the new scheme, facility by facility. Surplus from the old scheme's Target Period 6 does not carry over.
  • Buy-out. A site that misses its target can pay a buy-out fee per tonne of CO2e of shortfall to keep its certification. The government sets the price before each target period from a weighted average of the electricity and gas levy rates.
  • Penalties. The Environment Agency's penalty for inaccurate baseline or reporting information is the greater of £500 or £25 per tonne of CO2e, in line with the buy-out price, and the government has said it will carry out significantly more audits.
  • UK ETS energy is counted in the 70% test and must be reported, but it is not included in CCA targets.

Where solar fits in a CCA

For a CCA site, solar is worth far more for the bill and the target than for the levy.

The levy saving is small. Electricity you generate and use yourself is not bought from a supplier, so it carries no levy at all (our CCL guide). But a CCA site already pays only 8% of the rate, so there is little left to save.

The target saving is real. The government confirmed that in the new scheme self-generated electricity from PV, wind or hydro has a primary electricity factor of 1.0 and a carbon emissions factor of 0 tCO2e per kWh (government response). Every kWh your panels supply in place of grid power counts as zero carbon in your performance, which helps you meet the target and avoid buy-out. The grid electricity factors are fixed for the whole six years.

Example: What 100 kWp of solar does for the same CCA site (illustrative)

A 100 kWp rooftop system at an illustrative £900 per kWp costs £90,000 and generates about 90,000 kWh a year. 80% (72,000 kWh) is used on site.

Levy avoided without a CCA: 72,000 × £0.00801 = £577 a year

Levy avoided with a CCA: 8% of that, about £46 a year

Electricity no longer bought at an illustrative 24p: 72,000 × £0.24 = £17,280 a year, plus about £900 for the 18,000 kWh exported at 5p

In a carbon-based performance report, the 72,000 kWh count at zero instead of the grid factor

That is the site's shared example: about £18,180 a year and a simple payback of roughly 5 years before tax relief, with or without a CCA. See solar payback and capital allowances. Ask your sector association how on-site generation is reported in your umbrella agreement before you size the system.

A green tariff is different. It does not remove the levy, and it is the self-generated electricity rule that gives solar its zero carbon factor. See REGO certificates and solar PPAs.

CCAs, BICS and ESOS

Three schemes that energy intensive businesses often confuse: the Climate Change Agreement, the British Industrial Competitiveness Scheme (BICS) and the Energy Savings Opportunity Scheme (ESOS).

Scheme What it cuts or asks Who
Climate Change Agreement 92% off the levy on electricity, 89% on gas, for meeting targets Eligible facilities in eligible sectors, through their sector association
BICS From April 2027, eligible grid electricity exempt from Renewables Obligation, Feed-in Tariff and Capacity Market costs; it does not cover the levy Eligible manufacturers
ESOS An energy audit duty, not a discount Large undertakings

A CCA does not replace ESOS: the government response notes that an energy management system such as ISO 50001 is not required for the new scheme, but recommends one as good practice. Many of the sites that qualify are factories, food and drink processors and pig and poultry units, the same sites whose daytime load makes rooftop solar pay. A free site survey works out the system size from your half-hourly data.

Note: General information from GOV.UK, HMRC and the Department for Energy Security and Net Zero, not tax advice. Eligibility is decided through your sector association and the Environment Agency.

Sources

Read on 27 November 2026.

Frequently asked questions

What is a Climate Change Agreement?

A voluntary agreement between an energy intensive business and the Environment Agency, made through the business's sector association. The site agrees energy or carbon targets and in return pays a reduced rate of Climate Change Levy: 92% off the main rate on electricity and 89% off on gas, according to HMRC's rates table.

Can new businesses still join a Climate Change Agreement?

Yes. In the new scheme, new entrants in eligible sectors can apply between 1 January and 31 August each year from 2026 to 2029, and a facility must be added before 1 January 2030. You apply first to your sector association. The next window opens on 1 January 2027.

How long does the new CCA scheme run?

Targets run from 1 January 2026 to 31 December 2030 in three target periods: 2026, 2027 to 2028 and 2029 to 2030. Sites that meet their targets and other obligations keep the reduced Climate Change Levy rates until 31 March 2033.

What happens if we miss our CCA target?

You can pay a buy-out fee for each tonne of CO2e of shortfall to keep your certification and the reduced levy rate. The government sets the buy-out price before each target period from a weighted average of the electricity and gas levy rates. Surplus from beating a target can be carried to the next period.

Does solar count towards a Climate Change Agreement target?

Yes. The government confirmed that in the new scheme self-generated electricity from PV, wind or hydro has a primary electricity factor of 1.0 and a carbon emissions factor of zero. Solar you use on site in place of grid power therefore counts as zero carbon in your performance. Check with your sector association how it is reported.

Which new sectors can join a CCA from 2027?

Amending regulations published on 20 April 2026 add the mechanical recycling of plastic, the packaging of spirits and the production of automotive grade battery cells. They are anticipated to come into force on 1 January 2027, subject to approval by the House of Commons.

Free, with no obligation

See what your business could qualify for

Find out which grants, tax relief (capital allowances) and finance options your business may qualify for, and roughly what solar could save. It comes from a free call with us and a free survey with one MCS certified installer.

Tell us about the site in under two minutes. We review every enquiry, call you to understand the building and your electricity use, and if the site looks suitable we arrange a free survey with one MCS certified installer matched to it. We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  • On site or by video callWhichever suits the project and its stage.
  • Roof, structure, grid and energy useThe four things that decide whether solar works.
  • A clear proposalSystem size, cost range, savings and payback for your board.
  • One installer onlyYour details are not passed around a list of companies.

Want the detail first? Read how a survey works and what the survey includes.

See what your business could qualify for

Grants, tax relief and finance your business may qualify for, and roughly what solar could save. Six quick questions.

  • PPA
  • Buy outright
  • Hire purchase
  • Local schemes
Question 1 of 10: What kind of survey would you like?

Tap one to start.

Question 2 of 10: Do you own the building, or is it leased?

Tap one to carry on.

Question 3 of 10: Is this your first time looking into solar?

Tap one to carry on.

Question 4 of 10: What kind of site is it?

Tap one to carry on.

Question 5 of 10: Roughly what do you spend on electricity a month?

Tap one to carry on.

Question 6 of 10: When are you hoping to go ahead?

Tap one to carry on.

Where's the site?

So we match you with an installer who covers your area.

Who should we ask for?

The person we'll speak to about the survey.

What's the best mobile for you?

We'll ring to talk through the site. UK mobiles only.

Last one. Where should we email you?

Your survey details go here.

Free site survey, no obligation.

See what you qualify for